Takwimu Kenya · Report D

Development and Investment Opportunities

What the evidence held says about Siaya's economic sectors, service gaps and infrastructure constraints (no returns or market sizes are estimated)

DRAFT. Every figure in this report is “Provisional: awaiting editorial review” unless it carries a mark. This notice replaces a label on each figure; the watermark stays until every included figure has a review record.

Review state: 283 provisional, 0 approved, 87 disputed, 0 superseded, 0 withdrawn.

Marks: Approved approved in editorial review; Disputed the data file records a conflict for this value (both readings are kept); Superseded replaced by a later reading; a withdrawn value prints the withdrawal and its reason instead of the number.

Edition
Edition 1 (draft for editorial review)
Date
2026-11-27 (latest compile date of the input data files)
Reference period
2013 to 2027 (earliest and latest years in the figures shown)
Snapshot ID
da3d831b453a
Geography
Siaya County (county code 41), Kenya
Licence
Takwimu text: reuse with credit (terms). Source documents keep their publishers’ terms.

How to read this report, the method, the confidence scales and the licence are set out once for all five reports at How to read these reports (takwimukenya.com/reports/method/). In short: Findings are values as the documents print them; Interpretation is Takwimu’s reading, not a finding; where documents disagree all values are shown and none is chosen.

1. Scope and limits

Canonical topic page: Siaya economy (takwimukenya.com/counties/siaya/economy/).

Findings

This report lists only what the documents held say about sectors, service gaps and infrastructure constraints. It does not estimate market sizes, returns, costs or project financials: none of these is published in the documents held, and inventing them would mislead. Where evidence is absent, the report says so.

2. Economic sectors (Gross County Product)

Canonical topic page: Siaya economy (takwimukenya.com/counties/siaya/economy/).

Findings

Gross value added by activity, 2024, current prices (KNBS GCP 2025; 2024 provisional)
IndicatorValue
Gva by activity: Agriculture, forestry and fishing (current prices, GCP2025)67,741 KSh million
Gva by activity: Mining and quarrying (current prices, GCP2025)2,033 KSh million
Gva by activity: Manufacturing (current prices, GCP2025)4,606 KSh million
Gva by activity: Electricity supply (current prices, GCP2025)561 KSh million
Gva by activity: Water supply; waste collection (current prices, GCP2025)732 KSh million
Gva by activity: Construction (current prices, GCP2025)9,848 KSh million
Gva by activity: Wholesale and retail trade; repair of motor vehicles (current prices, GCP2025)1,735 KSh million
Gva by activity: Transport and storage (current prices, GCP2025)19,435 KSh million
Gva by activity: Accommodation and food service activities (current prices, GCP2025)985 KSh million
Gva by activity: Information and communication (current prices, GCP2025)3,475 KSh million
Gva by activity: Financial and insurance activities (current prices, GCP2025)1,302 KSh million
Gva by activity: Real estate activities (current prices, GCP2025)8,612 KSh million
Gva by activity: Professional and technical services (current prices, GCP2025)3,683 KSh million
Gva by activity: Administrative support services (current prices, GCP2025)1,662 KSh million
Gva by activity: Public administration and defence (current prices, GCP2025)13,145 KSh million
Gva by activity: Education (current prices, GCP2025)15,435 KSh million
Gva by activity: Human health and social work activities (current prices, GCP2025)3,694 KSh million
Gva by activity: Other service activities (current prices, GCP2025)5,710 KSh million
Gva by activity: Financial services indirectly measured (FISIM, deducted) (current prices, GCP2025)-526 KSh million

Every row: period 2024; source KNBS-01-PDF; page PDF p. 54 (printed 40); confidence 5 of 5; Annexe I: GCP by Economic Activity at Current Prices, 2024; KNBS marks the year provisional.

Growth
IndicatorValuePeriodSourcePageConfidence
Real growth avg (constant 2016 prices, GCP2025)1,24.6 percent per year2020-2024KNBS-01-PDFPDF p. 46 (printed 32)3 of 5
Real growth avg (constant 2016 prices, GCP2024)33.8 percent per year2019-2023KNBS-02-PDFPDF p. 42 (printed 28)4 of 5
  1. Figure 6: GCP Growth Rates vs Average GDP Growth, 2020–2024.
  2. KNBS marks the year provisional.
  3. Figure 7: Average Growth in Real GCP Relative to Total Economy’s Growth in Gross Value Added, 2019-2023.
Revisions to gross value added by activity between editions
MeasurePeriodGCP 2024 editionGCP 2025 editionDifferencePossible reason
Gva by activity: mining quarrying (current)20231,770 KSh millionKNBS-02-PDF; PDF p. 48 (printed 34); 2023; confidence 5 of 5.1,907 KSh millionKNBS-01-PDF; PDF p. 56 (printed 42); 2023; confidence 5 of 5.7.7%–
Gva by activity: electricity supply (current)2023325 KSh millionKNBS-02-PDF; PDF p. 48 (printed 34); 2023; confidence 5 of 5.444 KSh millionKNBS-01-PDF; PDF p. 56 (printed 42); 2023; confidence 5 of 5.36.6%–
Gva by activity: transport storage (current)202320,512 KSh millionKNBS-02-PDF; PDF p. 48 (printed 34); 2023; confidence 5 of 5.18,791 KSh millionKNBS-01-PDF; PDF p. 56 (printed 42); 2023; confidence 5 of 5.-8.4%–
Gva by activity: human health social work (current)20233,465 KSh millionKNBS-02-PDF; PDF p. 49 (printed 35); 2023; confidence 5 of 5.3,220 KSh millionKNBS-01-PDF; PDF p. 56 (printed 42); 2023; confidence 5 of 5.-7.1%–

Interpretation (Takwimu editorial, not a finding)

Agriculture, forestry and fishing is the largest activity in the county accounts. Sector size alone says nothing about profitability or investability.

3. Value chains: agriculture, livestock and fisheries

Canonical topic page: Siaya agriculture and fisheries (takwimukenya.com/counties/siaya/agriculture/).

Findings

Production, area and value as printed (two sources, different years and units)
IndicatorValuePeriodSourcePageConfidence
Area cropped: maize184,000 ha2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Area cropped: maize178,132 ha2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Production: maize1129,818 tonnesDisputed2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Production: maize11,372,914 tonnesDisputed2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)1 of 5
Production value: maize13,427.2 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Area cropped: beans144,576 ha2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Area cropped: beans147,915 ha2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Production: beans120,262 tonnesDisputed2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Production: beans1348,283 tonnesDisputed2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)1 of 5
Production value: beans11,114.4 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Area cropped: sorghum116,564 ha2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Area cropped: sorghum115,986 ha2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Production: sorghum122,587 tonnesDisputed2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Production: sorghum1128,726 tonnesDisputed2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)1 of 5
Production value: sorghum1596.3 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Area cropped: rice11,400 ha2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Area cropped: rice12,648 ha2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Production: rice18,273 tonnes2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Production: rice18,138 tonnes2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)1 of 5
Production value: rice1291.2 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Area cropped: cassava14,867 ha2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Area cropped: cassava12,987 ha2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)4 of 5
Production: cassava187,606 tonnes2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Production: cassava128,700 tonnes2014KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)1 of 5
Production value: cassava11,752.1 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 28 (printed 11)3 of 5
Production: maize21,286,755 bagsDisputed2013KNBS-CSA-SIAYA-2015PDF p. 29 (printed 12)3 of 5
Production: maize21,372,914 bagsDisputed2014KNBS-CSA-SIAYA-2015PDF p. 29 (printed 12)3 of 5
Production: beans2363,906 bagsDisputed2013KNBS-CSA-SIAYA-2015PDF p. 29 (printed 12)3 of 5
Production: beans2348,283 bagsDisputed2014KNBS-CSA-SIAYA-2015PDF p. 29 (printed 12)3 of 5
Production: sorghum2159,533 bagsDisputed2013KNBS-CSA-SIAYA-2015PDF p. 29 (printed 12)3 of 5
Production: sorghum2128,726 bagsDisputed2014KNBS-CSA-SIAYA-2015PDF p. 29 (printed 12)3 of 5
Livestock population: cattle dairy35,285 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: cattle dairy35,698 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: cattle beef zebu3323,287 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: cattle beef zebu3492,591 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: sheep hair3139,456 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: sheep hair3143,752 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: goats dairy33,630 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: goats dairy34,656 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: goats meat3257,221 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: goats meat3260,252 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: pigs314,186 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: pigs313,453 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: rabbits312,170 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: rabbits312,324 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry broilers364,498 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry broilers363,688 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry layers339,097 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry layers340,394 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry indigenous3797,651 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry indigenous3804,161 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry others322,309 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: poultry others324,262 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: donkeys37,577 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: donkeys37,719 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: beehives log3214 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: beehives log3202 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: beehives ktbh32,281 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: beehives ktbh32,148 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: beehives langstroth37,282 number2013KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Livestock population: beehives langstroth38,310 number2014KNBS-CSA-SIAYA-2015PDF p. 31 (printed 14)4 of 5
Fish ponds: aquaculture41,237 number2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish ponds: aquaculture41,364 number2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed quantity: capture freshwater528,222 tonnesDisputed2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed value: capture freshwater53,554 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Aquaculture quantity: aquaculture5677 tonnes2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Aquaculture value: aquaculture5204 KSh million2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed quantity: capture freshwater527,141 tonnesDisputed2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed value: capture freshwater53,973 KSh million2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Aquaculture quantity: aquaculture5689 tonnes2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Aquaculture value: aquaculture5206 KSh million2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed quantity: capture lake victoria and kanyaboli624,703 tonnesDisputed2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed value: capture lake victoria and kanyaboli63,046,858 KSh thousand2013KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed quantity: capture lake victoria and kanyaboli628,519 tonnesDisputed2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish landed value: capture lake victoria and kanyaboli63,380,209 KSh thousand2014KNBS-CSA-SIAYA-2015PDF p. 36 (printed 19)4 of 5
Fish production: fisheries all7Not publishedDisputed2023GOV-01-PDFPDF p. 39 (printed 20)1 of 5
Irrigated area: all crops7680 haDisputed2023GOV-01-PDFPDF p. 39 (printed 20)2 of 5
Fish landing sites: fisheries all788 numberDisputed2023GOV-01-PDFPDF p. 39 (printed 20)2 of 5
Jetties: fisheries all75 number2023GOV-01-PDFPDF p. 39 (printed 20)3 of 5
Production: sorghum825,087 thousand tonnesDisputed2018-2022GOV-01-PDFPDF p. 42 (printed 23)1 of 5
Production: roots and tubers8139,500 thousand tonnes2018-2022GOV-01-PDFPDF p. 42 (printed 23)1 of 5
Fish production: capture freshwater830,000 thousand tonnesDisputed2018-2022GOV-01-PDFPDF p. 42 (printed 23)1 of 5
Fish production: aquaculture8147.6 thousand tonnes2018-2022GOV-01-PDFPDF p. 42 (printed 23)1 of 5
Irrigated area: all crops91,000.5 acresDisputed2022GOV-01-PDFPDF p. 196 (printed 177)3 of 5
Mechanised area: all crops962,600 acres2022GOV-01-PDFPDF p. 196 (printed 177)3 of 5
Production: cereals9166,329,000 kg2022GOV-01-PDFPDF p. 196 (printed 177)3 of 5
Production: roots and tubers910,166,000 kg2022GOV-01-PDFPDF p. 196 (printed 177)3 of 5
Fish production: capture freshwater1029,625,057 kgDisputed2022GOV-01-PDFPDF p. 197 (printed 178)3 of 5
Fish production value: capture freshwater104,245,813,654 KSh2022GOV-01-PDFPDF p. 197 (printed 178)3 of 5
Fish production: aquaculture10183,210 kg2022GOV-01-PDFPDF p. 197 (printed 178)3 of 5
Fish production value: aquaculture1038,474,000 KSh2022GOV-01-PDFPDF p. 197 (printed 178)3 of 5
  1. Table 4.2: Area Cropped, Production and Value for Various Crops, 2013-2014.
  2. Table 4.5: Cash Crop Production by Type and Quantity, 2013 - 2014.
  3. Table 5.1: Livestock Population Trends, 2013 - 2014.
  4. Table 6.1: Fish Ponds by Sub County, 2013 - 2014.
  5. Table 6.2: Quantity and Value of Fish Produced, 2013 - 2014.
  6. Table 6.3: Fish Production by Water Bodies 2013-2014.
  7. Section 1.9 The Blue Economy (text).
  8. Section 2.3.2 table: Agriculture, Livestock and Fisheries targets and achievements (CIDP 2018-2022 review).
  9. Chapter 6 monitoring and evaluation matrix: Agriculture and Livestock outcome indicators.
  10. Chapter 6 monitoring and evaluation matrix: Sustainable Utilization of Fisheries Resources.
County plan targets (plans, not outcomes)
IndicatorValuePeriodPageConfidence
Production: sorghum (target)132,000 thousand tonnes2018-2022PDF p. 42 (printed 23)1 of 5
Production: roots and tubers (target)1158,100 thousand tonnes2018-2022PDF p. 42 (printed 23)1 of 5
Irrigated area: all crops (target)22,429 acres2023-2027 mid-termPDF p. 196 (printed 177)3 of 5
Irrigated area: all crops (target)24,043 acres2027PDF p. 196 (printed 177)3 of 5
Production: cereals (target)2196,147,000 kg2023-2027 mid-termPDF p. 196 (printed 177)3 of 5
Production: cereals (target)2200,215,000 kg2027PDF p. 196 (printed 177)3 of 5
Production: roots and tubers (target)212,000,000 kg2023-2027 mid-termPDF p. 196 (printed 177)3 of 5
Production: roots and tubers (target)215,000,000 kg2027PDF p. 196 (printed 177)3 of 5
Fish production: aquaculture (target)3253,210 kg2023-2027 mid-termPDF p. 197 (printed 178)3 of 5
Fish production: aquaculture (target)3300,000 kg2027PDF p. 197 (printed 178)3 of 5
Scheme area expansion: rice (target)46,500 acres2023-2027PDF p. 168 (printed 149)3 of 5
Scheme cost estimate: rice (target)45,881 KSh million2023-2027PDF p. 168 (printed 149)3 of 5
Scheme area expansion: rice (target)42,000 acres2023-2027PDF p. 169 (printed 150)3 of 5
Scheme cost estimate: rice (target)4615 KSh million2023-2027PDF p. 169 (printed 150)3 of 5

Every row: source GOV-01-PDF.

  1. Section 2.3.2 table: Agriculture, Livestock and Fisheries targets and achievements (CIDP 2018-2022 review).
  2. Chapter 6 monitoring and evaluation matrix: Agriculture and Livestock outcome indicators.
  3. Chapter 6 monitoring and evaluation matrix: Sustainable Utilization of Fisheries Resources.
  4. Table 4.2 Flagship Projects (irrigation rice schemes).

Agriculture: conflicting values

Area under irrigation
Value as heldIndicatorSource and pagePeriodConfidence
680 haDisputedIrrigated area: all cropsGOV-01-PDF; PDF p. 39 (printed 20)20232 of 5
1,000.5 acresDisputedIrrigated area: all cropsGOV-01-PDF; PDF p. 196 (printed 177)20223 of 5
Same plan gives 680 ha (p.20, "currently") and 1,000.5 acres (p.177, 2022 baseline). 1,000.5 acres is about 405 ha. Not reconciled; show both. All values shown are provisional (see the review notice on the cover); none has been chosen over another.
Capture fish landed, 2015 abstract
Value as heldIndicatorSource and pagePeriodConfidence
28,222 tonnesDisputedFish landed quantity: capture freshwaterKNBS-CSA-SIAYA-2015; PDF p. 36 (printed 19)20134 of 5
24,703 tonnesDisputedFish landed quantity: capture lake victoria and kanyaboliKNBS-CSA-SIAYA-2015; PDF p. 36 (printed 19)20134 of 5
27,141 tonnesDisputedFish landed quantity: capture freshwaterKNBS-CSA-SIAYA-2015; PDF p. 36 (printed 19)20144 of 5
28,519 tonnesDisputedFish landed quantity: capture lake victoria and kanyaboliKNBS-CSA-SIAYA-2015; PDF p. 36 (printed 19)20144 of 5
Table 6.2 gives 28,222 t (2013) and 27,141 t (2014); Table 6.3 gives 24,703 t and 28,519 t on the same page. Both from the county Department of Fisheries. Coverage difference not explained. All values shown are provisional (see the review notice on the cover); none has been chosen over another.
Maize, beans, sorghum production units, 2015 abstract
Value as heldIndicatorSource and pagePeriodConfidence
129,818 tonnesDisputedProduction: maizeKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20133 of 5
1,286,755 bagsDisputedProduction: maizeKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20133 of 5
1,372,914 tonnesDisputedProduction: maizeKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20141 of 5
1,372,914 bagsDisputedProduction: maizeKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20143 of 5
20,262 tonnesDisputedProduction: beansKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20133 of 5
363,906 bagsDisputedProduction: beansKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20133 of 5
348,283 tonnesDisputedProduction: beansKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20141 of 5
348,283 bagsDisputedProduction: beansKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20143 of 5
22,587 tonnesDisputedProduction: sorghumKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20133 of 5
159,533 bagsDisputedProduction: sorghumKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20133 of 5
128,726 tonnesDisputedProduction: sorghumKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20141 of 5
128,726 bagsDisputedProduction: sorghumKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20143 of 5
Table 4.2 2013 tonnes do not match Table 4.5 bags at 90 kg (maize 129,818 t vs 1,286,755 bags = 115,808 t at 90 kg; sorghum 22,587 t vs 159,533 bags; beans 20,262 t vs 363,906 bags). The Table 4.2 2014* "tonnes" equal the Table 4.5 bag counts, so that column is bags mislabelled. Bag weight not stated. All values shown are provisional (see the review notice on the cover); none has been chosen over another.
Fish production in CIDP 2023-2027
Value as heldIndicatorSource and pagePeriodConfidence
Not publishedDisputedFish production: fisheries allGOV-01-PDF; PDF p. 39 (printed 20)20231 of 5
30,000 thousand tonnesDisputedFish production: capture freshwaterGOV-01-PDF; PDF p. 42 (printed 23)2018-20221 of 5
29,625,057 kgDisputedFish production: capture freshwaterGOV-01-PDF; PDF p. 197 (printed 178)20223 of 5
Three statements: "30,147,600 metric tonnes per annum" (p.20), capture 30,000 and culture 147.6 under "000 (MT)" (p.23), capture 29,625,057 kg in 2022 (p.178). Units are inconsistent; magnitude about 30,000 t is consistent with the 2015 abstract (27,141-28,519 t in 2014). All values shown are provisional (see the review notice on the cover); none has been chosen over another.
Fish landing sites
Value as heldIndicatorSource and pagePeriodConfidence
88 numberDisputedFish landing sites: fisheries allGOV-01-PDF; PDF p. 39 (printed 20)20232 of 5
p.20 says 88 fish landing sites and, in the next paragraph, "over 60 existing beaches". No frame-survey count acquired to compare. All values shown are provisional (see the review notice on the cover); none has been chosen over another.
Sorghum production
Value as heldIndicatorSource and pagePeriodConfidence
22,587 tonnesDisputedProduction: sorghumKNBS-CSA-SIAYA-2015; PDF p. 28 (printed 11)20133 of 5
159,533 bagsDisputedProduction: sorghumKNBS-CSA-SIAYA-2015; PDF p. 29 (printed 12)20133 of 5
25,087 thousand tonnesDisputedProduction: sorghumGOV-01-PDF; PDF p. 42 (printed 23)2018-20221 of 5
Abstract: 22,587 t (2013). CIDP review: 25,087 under "000 (MT)" for 2018-2022 with no year. Not comparable until the CIDP unit and period are confirmed. All values shown are provisional (see the review notice on the cover); none has been chosen over another.

Interpretation (Takwimu editorial, not a finding)

Yields, prices and margins are not published in the sources held, so no value chain can be ranked by return.

4. Service gaps

Canonical topic pages: Siaya climate, water and environment (takwimukenya.com/counties/siaya/climate/); Siaya health (takwimukenya.com/counties/siaya/health/); Siaya education (takwimukenya.com/counties/siaya/education/).

Findings

Water and sanitation coverage
IndicatorValuePeriodSourcePageConfidence
Drinking water: At least basic service, county (Siaya)148.5 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 607 (printed 565)4 of 5
Drinking water: Limited service, county (Siaya)17 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 607 (printed 565)4 of 5
Drinking water: Unimproved, county (Siaya)11.8 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 607 (printed 565)4 of 5
Drinking water: Surface water, county (Siaya)142.7 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 607 (printed 565)4 of 5
Sanitation: At least basic service, county (Siaya)235 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 615 (printed 573)4 of 5
Sanitation: Limited service, county (Siaya)219.7 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 615 (printed 573)4 of 5
Sanitation: Unimproved, county (Siaya)239 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 615 (printed 573)4 of 5
Sanitation: Open defecation, county (Siaya)26.2 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)KDHS-2022PDF p. 615 (printed 573)4 of 5
Households with access to safe water (CIDP narrative), county (Siaya)358 percent of householdscurrent at plan preparation (CIDP 2023-2027; baseline year not stated in this paragraph)GOV-01-PDFPDF p. 109 (printed 90)3 of 5
Population with access to quality water supply (CIDP indicator baseline), county (Siaya)458 percent of population2022 (baseline year as printed)GOV-01-PDFPDF p. 194 (printed 175)3 of 5
Households with access to safe drinking water (CIDP indicator baseline), county (Siaya)5144,273 households2022 (baseline year as printed)GOV-01-PDFPDF p. 194 (printed 175)3 of 5
SIBOWASCO (Sibo) water coverage, utility service area (Sibo)662 percent of population in the utility service areaFY 2024/25WASREB-IMPACT-18PDF p. 55 (printed 38)4 of 5
Population in SIBOWASCO service area, utility service area (Sibo)7593,624 personsFY 2024/25WASREB-IMPACT-18PDF p. 53 (printed 36)4 of 5
Population served by SIBOWASCO, utility service area (Sibo)8368,306 personsFY 2024/25WASREB-IMPACT-18PDF p. 53 (printed 36)4 of 5
County population served by formalized WSPs, county (Siaya)934 percent of county populationFY 2024/25WASREB-IMPACT-18PDF p. 89 (printed 72)2 of 5
Population in low-income areas (LIA) of WSP service areas, county (Siaya)1067,722 personsFY 2024/25WASREB-IMPACT-18PDF p. 92 (printed 75)4 of 5
Population served in low-income areas with water services, county (Siaya)1163,443 personsFY 2024/25WASREB-IMPACT-18PDF p. 92 (printed 75)4 of 5
  1. WHO/UNICEF JMP drinking water service ladder. At least basic = improved source with water on premises or round trip of 30 minutes or less (includes safely managed); limited = improved source, round trip over 30 minutes or unknown; unimproved = unprotected dug well or spring; surface water.
  2. WHO/UNICEF JMP sanitation ladder. At least basic = improved facility not shared with other households (includes safely managed); limited = improved facility shared by 2 or more households; unimproved; open defecation.
  3. CIDP does not define 'safe water' or name the source of the 58%.
  4. Indicator baseline; definition and source not stated. Mid-term 61% and end-term 65% are targets and are not recorded.
  5. Count of households; definition and source not stated. 151,735 and 161,685 are targets and are not recorded.
  6. WASREB water coverage = population served / population in the utility's service area; covers SIBOWASCO's area only, not the whole county.
  7. Total population in service area as reported by the utility to WASREB.
  8. Total population served as reported by the utility to WASREB.
  9. Share of the whole county population served by formalized water service providers; the rest (66%) is shown as not served by a WSP, which does not mean without water.
  10. Population living in utility-designated low-income areas.
  11. Population served with water services within the LIA.
Health staffing by sub-county, 2022
IndicatorValuePage
Population per doctor (all ages), Alego Usonga12,526 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per doctor (all ages), Bondo20,053 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per doctor (all ages), Gem68,126 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per doctor (all ages), Rarieda170,952 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per doctor (all ages), Ugenya138,626 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per doctor (all ages), Ugunja118,315 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per nurse (all ages), Alego Usonga1,087 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per nurse (all ages), Bondo1,355 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per nurse (all ages), Gem2,129 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per nurse (all ages), Rarieda2,220 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per nurse (all ages), Ugenya2,100 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per nurse (all ages), Ugunja1,793 people per health worker (printed as 1:N)PDF p. 207 (printed 188)
Population per clinical officer (all ages), Alego Usonga3,173 people per health worker (printed as 1:N)PDF p. 208 (printed 189)
Population per clinical officer (all ages), Bondo5,420 people per health worker (printed as 1:N)PDF p. 208 (printed 189)
Population per clinical officer (all ages), Gem6,593 people per health worker (printed as 1:N)PDF p. 208 (printed 189)
Population per clinical officer (all ages), Rarieda8,547 people per health worker (printed as 1:N)PDF p. 208 (printed 189)
Population per clinical officer (all ages), Ugenya4,471 people per health worker (printed as 1:N)PDF p. 208 (printed 189)
Population per clinical officer (all ages), Ugunja4,225 people per health worker (printed as 1:N)PDF p. 208 (printed 189)

Every row: period 2022 ('as at 2022'); source CIDP-2023; confidence 2 of 5; Staff count over population (source not named); secondary report.

Pre-primary and vocational training indicators (devolved functions)
IndicatorValuePeriodSourcePageConfidence
Pre primary enrolment, pre-primary, public1,265,179 pupils2019MOE-BESB-2019PDF p. 79 (printed 62)5 of 5
Pre primary enrolment, pre-primary, private1,234,553 pupils2019MOE-BESB-2019PDF p. 79 (printed 62)5 of 5
Pre primary enrolment, pre-primary1,299,732 pupils2019MOE-BESB-2019PDF p. 79 (printed 62)5 of 5
Gross enrolment rate, pre-primary3,2190.7 percentDisputed2019MOE-BESB-2019PDF p. 77 (printed 60)2 of 5
Pupil teacher ratio, pre-primary, public1,245.5 pupils per teacher2019MOE-BESB-2019PDF p. 79 (printed 62)5 of 5
Pupil teacher ratio, pre-primary, private1,232.3 pupils per teacher2019MOE-BESB-2019PDF p. 79 (printed 62)5 of 5
Pupil teacher ratio, pre-primary1,239.9 pupils per teacher2019MOE-BESB-2019PDF p. 79 (printed 62)5 of 5
Pre primary centres, pre-primary, public4,2679 centresDisputed2019MOE-BESB-2019PDF p. 80 (printed 63)5 of 5
Pre primary centres, pre-primary, private4,2473 centres2019MOE-BESB-2019PDF p. 80 (printed 63)5 of 5
Pre primary centres, pre-primary4,21,152 centres2019MOE-BESB-2019PDF p. 80 (printed 63)5 of 5
Pre primary centres, pre-primary, public5,2744 centres2014MOE-BESB-2014PDF p. 45 (printed 31)5 of 5
Pre primary centres, pre-primary, private5,2150 centres2014MOE-BESB-2014PDF p. 45 (printed 31)5 of 5
Pre primary centres, pre-primary5,2894 centres2014MOE-BESB-2014PDF p. 45 (printed 31)5 of 5
Pre primary enrolment, pre-primary, public6,256,477 pupils2014MOE-BESB-2014PDF p. 51 (printed 37)5 of 5
Pre primary enrolment, pre-primary, private6,28,474 pupils2014MOE-BESB-2014PDF p. 51 (printed 37)5 of 5
Pre primary enrolment, pre-primary7,264,952 pupilsDisputed2014MOE-BESB-2014PDF p. 46 (printed 32)5 of 5
Gross enrolment rate, pre-primary7,273.5 percent2014MOE-BESB-2014PDF p. 46 (printed 32)4 of 5
Net enrolment rate, pre-primary7,271.4 percent2014MOE-BESB-2014PDF p. 46 (printed 32)4 of 5
Pupil teacher ratio, pre-primary, public6,237.8 pupils per teacher2014MOE-BESB-2014PDF p. 51 (printed 37)5 of 5
Pupil teacher ratio, pre-primary, private6,219.6 pupils per teacher2014MOE-BESB-2014PDF p. 51 (printed 37)5 of 5
Pupil teacher ratio, pre-primary6,228.7 pupils per teacherDisputed2014MOE-BESB-2014PDF p. 51 (printed 37)2 of 5
Pre primary centres, pre-primary, public8,9744 centres2014KNBS-ABS-2015PDF p. 44 (printed 27)5 of 5
Pre primary centres, pre-primary, private8,9150 centres2014KNBS-ABS-2015PDF p. 44 (printed 27)5 of 5
Pre primary centres, pre-primary8,9894 centres2014KNBS-ABS-2015PDF p. 44 (printed 27)5 of 5
Pre primary enrolment, pre-primary10,262,434 pupils2013KNBS-ABS-2015PDF p. 46 (printed 29)5 of 5
Pre primary enrolment, pre-primary10,964,952 pupils2014KNBS-ABS-2015PDF p. 46 (printed 29)5 of 5
Gross enrolment rate, pre-primary11,973.5 percentDisputed2014KNBS-ABS-2015PDF p. 46 (printed 29)3 of 5
Net enrolment rate, pre-primary11,971.4 percent2014KNBS-ABS-2015PDF p. 46 (printed 29)4 of 5
Vtc enrolment, vtc12,21,047 trainees2013KNBS-ABS-2015PDF p. 53 (printed 36)4 of 5
Vtc enrolment, vtc12,91,173 trainees2014KNBS-ABS-2015PDF p. 53 (printed 36)5 of 5
Vtc centres, vtc12,916 institutions listedDisputed2014KNBS-ABS-2015PDF p. 53 (printed 36)3 of 5
Pre primary enrolment, pre-primary13,276,680 pupils2018 (start of CIDP 2018-2022)CIDP-2023-2027PDF p. 44 (printed 25)2 of 5
Pre primary enrolment, pre-primary13Unclear: equals the projected 3-5 population; not shown as enrolmentDisputed2022 (end of CIDP 2018-2022)CIDP-2023-2027PDF p. 44 (printed 25)1 of 5
Pre primary centres, pre-primary14,2700 centres (approximate)Disputed2023 (plan baseline)CIDP-2023-2027PDF p. 143 (printed 124)2 of 5
Pre primary centres equipped, pre-primary14,2340 centres2023 (plan baseline)CIDP-2023-2027PDF p. 143 (printed 124)2 of 5
Pre primary teachers required, pre-primary14,151,450 teachers2023 (plan baseline)CIDP-2023-2027PDF p. 143 (printed 124)2 of 5
Pre primary enrolment rate, pre-primary14,298 percent2023 (plan baseline)CIDP-2023-2027PDF p. 143 (printed 124)1 of 5
Pre primary new enrolment, pre-primary16,174,033 pupils2023CIDP-2023-2027PDF p. 193 (printed 174)3 of 5
Pre primary new enrolment, pre-primary16,1520,165 pupils2027CIDP-2023-2027PDF p. 193 (printed 174)3 of 5
Vtc centres, vtc14,235 centresDisputed2023 (plan baseline)CIDP-2023-2027PDF p. 143 (printed 124)3 of 5
Vtc enrolment, vtc13,21,580 trainees2018 (start of CIDP 2018-2022)CIDP-2023-2027PDF p. 44 (printed 25)2 of 5
Vtc enrolment, vtc13,23,706 trainees2022 (end of CIDP 2018-2022)CIDP-2023-2027PDF p. 44 (printed 25)2 of 5
Vtc new enrolment, vtc16,171,200 students2023CIDP-2023-2027PDF p. 194 (printed 175)3 of 5
  1. Table 42.
  2. actual.
  3. Table 40.
  4. Table 43.
  5. Table 16.
  6. Table 22.
  7. Table 17.
  8. Table 13.1.
  9. provisional.
  10. Table 13.7.
  11. Table 13.8.
  12. Table 13.24.
  13. Section 2.3.4 (text).
  14. Section 4.1.8 (text).
  15. plan_target.
  16. M&E outcome indicators (Chapter 6).
  17. baseline.

Interpretation (Takwimu editorial, not a finding)

Among the indicators held, doctor coverage varies most between sub-counties, and the water-access figures depend heavily on which definition a document uses.

5. Infrastructure constraints

Canonical topic pages: Siaya project register (takwimukenya.com/counties/siaya/projects/); Siaya climate, water and environment (takwimukenya.com/counties/siaya/climate/).

Findings

Projects recorded as delayed, suspended, cancelled or of unknown status (contractors are not named)
IDProject (as printed)SectorStatus (evidence)Latest budget or contract amount
SIA-P-001Construction of Siaya County Stadiumsports culture tourismdelayedDisputedaudit-2023-24; PDF p. 55; 2024-08-30; confidence 4 of 5.424,872,927 KShDisputedcob-report-2023-24; PDF p. 516; FY 2023/24; confidence 3 of 5.
SIA-P-002Installation of three-phase electricity power at the Siaya Stadiumenergy lightingdelayedaudit-2023-24; PDF p. 53; 2024; confidence 4 of 5.None held
SIA-P-005Proposed installation of Tartan on the running tracksports culture tourismdelayedcob-report-2024-25; PDF p. 483; 2025-06-30; confidence 3 of 5.137,350,000 KShcob-report-2024-25; PDF p. 483; FY 2024/25; confidence 3 of 5.
SIA-P-007Construction of Siaya Bus Parkroads transportcancelledDisputedaudit-2022-23; PDF p. 46; 2023-11; confidence 4 of 5.23,014,867 KShDisputedaudit-2021-22; PDF p. 53; FY 2021/22; confidence 4 of 5.
SIA-P-008Construction of Haudinga Sheltered Workshop in Ukwalasocial servicesdelayedDisputedaudit-2020-21; PDF p. 38; 2021-11; confidence 4 of 5.6,678,405 KShDisputedaudit-2020-21; PDF p. 38; FY 2020/21; confidence 4 of 5.
SIA-P-009Construction of Nyasanda Sheltered Workshop in Ugunjasocial servicesdelayedDisputedaudit-2020-21; PDF p. 38; 2021-11; confidence 4 of 5.6,831,702 KShDisputedaudit-2020-21; PDF p. 38; FY 2020/21; confidence 4 of 5.
SIA-P-010Construction of Nyamnina Youth PolytechniceducationdelayedDisputedaudit-2020-21; PDF p. 38; 2021-11; confidence 4 of 5.3,870,156 KShDisputedaudit-2020-21; PDF p. 38; FY 2020/21; confidence 4 of 5.
SIA-P-011Renovations at Odera Akang'o Campus (works at Directors Office)educationdelayedDisputedaudit-2020-21; PDF p. 39; 2021-11; confidence 4 of 5.36,653,220 KShDisputedaudit-2020-21; PDF p. 39; FY 2020/21; confidence 4 of 5.
SIA-P-012Construction of a laboratory at Obaga West Asembo Health Centrehealthunknownaudit-2020-21; PDF p. 39; 2021-11; confidence 4 of 5.None held
SIA-P-013Maintenance of Maira Othatch Road and Bar Okwiri Kayouth roadsroads transportunknownaudit-2020-21; PDF p. 40; 2021-11; confidence 4 of 5.None held
SIA-P-014Rehabilitation of Siaya Slaughterhouseagriculture fisheriesdelayedaudit-2020-21; PDF p. 40; 2021-11; confidence 4 of 5.9,984,993 KShaudit-2020-21; PDF p. 40; FY 2020/21; confidence 4 of 5.
SIA-P-015Construction of Migwena Sports Stadium (2017 contract)sports culture tourismcancelledaudit-2020-21; PDF p. 40; 2021-11; confidence 4 of 5.22,433,511 KShaudit-2020-21; PDF p. 40; FY 2020/21; confidence 4 of 5.
SIA-P-016Drainage, grading, gravelling and dozing of Kwaweya Yenga Nyalula Udura Kolum road (12 km)roads transportdelayedaudit-2021-22; PDF p. 53; 2022-07-27; confidence 4 of 5.None held
SIA-P-017Repairs and maintenance of Boro-Katondi Road, Ogunga Road and Segere-Ouru Roadroads transportunknownaudit-2021-22; PDF p. 53; 2022-11-10; confidence 3 of 5.14,659,268 KShaudit-2021-22; PDF p. 53; FY 2021/22; confidence 3 of 5.
SIA-P-018Tarmacking of Opoda-Bondo township roadroads transportdelayedDisputedaudit-2021-22; PDF p. 53; 2022-06-30; confidence 4 of 5.52,805,116 KShDisputedaudit-2021-22; PDF p. 53; FY 2021/22; confidence 4 of 5.
SIA-P-019Construction of five ECD classrooms (Mahero, Kirindo, Ninga, Nyadheho and Nyabondo primary schools)educationdelayedaudit-2021-22; PDF p. 54; 2022; confidence 4 of 5.19,124,181 KShaudit-2021-22; PDF p. 54; FY 2021/22; confidence 4 of 5.
SIA-P-020Construction of Early Childhood Development (ECD) block at Kirindo primary schooleducationsuspendedaudit-2022-23; PDF p. 46; 2023-11; confidence 4 of 5.3,888,053 KShaudit-2022-23; PDF p. 46; FY 2022/23; confidence 4 of 5.
SIA-P-021Drilling and equipping of nine boreholes in Ugunja, Alego and Rarieda sub-countieswater sanitationdelayedaudit-2021-22; PDF p. 54; 2022; confidence 4 of 5.29,040,488 KShaudit-2021-22; PDF p. 54; FY 2021/22; confidence 4 of 5.
SIA-P-022Supply and installation of machines, wiring repairs and construction of a powerhouse at Madiany Ginneryagriculture fisheriesunknownaudit-2021-22; PDF p. 54; 2022-11-15; confidence 4 of 5.10,237,191 KShaudit-2021-22; PDF p. 54; FY 2021/22; confidence 4 of 5.
SIA-P-024Construction of Modern Market in Ukwala Marketmarkets tradesuspendedaudit-2022-23; PDF p. 47; 2023-09; confidence 4 of 5.5,740,187.46 KShaudit-2022-23; PDF p. 47; FY 2022/23; confidence 4 of 5.
SIA-P-025Construction of Nyadorera Modern Marketmarkets tradedelayedaudit-2022-23; PDF p. 47; 2023-11; confidence 4 of 5.11,665,784 KShaudit-2022-23; PDF p. 47; FY 2022/23; confidence 4 of 5.
SIA-P-026Fencing and gravelling works at Akala and Ramba Marketsmarkets tradedelayedaudit-2022-23; PDF p. 47; 2023-10; confidence 4 of 5.7,715,774 KShaudit-2022-23; PDF p. 47; FY 2022/23; confidence 4 of 5.
SIA-P-027Drilling and equipping of Aila WC Boreholewater sanitationunknownDisputedaudit-2022-23; PDF p. 48; 2023-08; confidence 4 of 5.4,479,975 KShDisputedaudit-2022-23; PDF p. 48; FY 2022/23; confidence 4 of 5.
SIA-P-029Proposed washroom, gravelling works, waterworks, powerhouse and electrification at Migwenasports culture tourismdelayedaudit-2023-24; PDF p. 55; 2024; confidence 4 of 5.18,630,456 KShaudit-2023-24; PDF p. 55; FY 2023/24; confidence 4 of 5.
SIA-P-030Construction of County Aggregation and Industrial ParkindustrysuspendedDisputedaudit-2024-25; PDF p. 54; 2025-10; confidence 3 of 5.483,688,922 KShDisputedaudit-2024-25; PDF p. 54; FY 2024/25; confidence 3 of 5.
SIA-P-031Proposed Construction of Yala Cattle Ring in Yala Township Wardagriculture fisheriesdelayedaudit-2023-24; PDF p. 56; 2024; confidence 4 of 5.4,500,962.55 KShaudit-2023-24; PDF p. 56; FY 2023/24; confidence 4 of 5.
SIA-P-032Construction of four door flushable toilets and four bathrooms at Akala Health Centrehealthsuspendedaudit-2023-24; PDF p. 56; 2024-09-17; confidence 4 of 5.3,215,578.8 KShaudit-2023-24; PDF p. 56; FY 2023/24; confidence 4 of 5.
SIA-P-033Construction of ECD Block at Maranyona Primary Schooleducationdelayedaudit-2024-25; PDF p. 54; 2025-07; confidence 3 of 5.4,134,669 KShaudit-2024-25; PDF p. 54; FY 2024/25; confidence 3 of 5.
SIA-P-034Proposed completion of ECD Block at Nyabera Primary Schooleducationsuspendedaudit-2024-25; PDF p. 55; 2025-07; confidence 3 of 5.4,307,957 KShaudit-2024-25; PDF p. 55; FY 2024/25; confidence 3 of 5.
SIA-P-036Supply, delivery, installation and commissioning of mortuary cold-room plant at Bondo Sub-County HospitalhealthdelayedDisputedaudit-2024-25; PDF p. 59; 2025-10; confidence 3 of 5.54,685,880 KShDisputedcob-report-2024-25; PDF p. 483; FY 2024/25; confidence 4 of 5.
SIA-P-037Supply, delivery and installation of medical equipment at Siaya Hospital Theatre ComplexhealthdelayedDisputedaudit-2024-25; PDF p. 56; 2025-10; confidence 3 of 5.22,974,650 KShDisputedaudit-2024-25; PDF p. 55; FY 2024/25; confidence 3 of 5.
SIA-P-039Drilling and equipping of two boreholes at Ligose Primary and Ligala Dispensarywater sanitationunknownaudit-2024-25; PDF p. 56; 2025-07; confidence 3 of 5.5,819,100 KShaudit-2024-25; PDF p. 56; FY 2024/25; confidence 3 of 5.
SIA-P-040Drilling and equipping of a borehole at Yengawater sanitationunknownaudit-2024-25; PDF p. 56; 2025-10; confidence 3 of 5.None held
SIA-P-041Supply, installation, configuration, customisation, testing, commissioning and support of an Enterprise Resource Planning (ERP) management information systemictdelayedDisputedaudit-2022-23; PDF p. 49; 2023; confidence 4 of 5.72,420,000 KShDisputedaudit-2022-23; PDF p. 49; FY 2022/23; confidence 4 of 5.
SIA-P-042Drilling and equipping of boreholes and construction of water kiosks in the ward officeswater sanitationsuspendedDisputedaudit-asm-2023-24; PDF p. 56; 2024-09; confidence 4 of 5.117,133,552 KShDisputedaudit-asm-2022-23; PDF p. 54; FY 2022/23; confidence 4 of 5.
SIA-P-043Construction of meeting halls in the ward officesgovernance officessuspendedDisputedaudit-asm-2023-24; PDF p. 56; 2024-09; confidence 4 of 5.104,900,292 KShDisputedcob-report-2022-23; PDF p. 581; FY 2022/23; confidence 4 of 5.
SIA-P-051Installation of High mast lights in various locations in Siaya Countyenergy lightingdelayedcob-report-2024-25; PDF p. 483; 2025-06-30; confidence 4 of 5.179,009,460 KShcob-report-2024-25; PDF p. 483; FY 2024/25; confidence 4 of 5.
SIA-P-061Construction of bus park at Bondoroads transportunknowncob-report-2020-21; PDF p. 377; 2021-06-30; confidence 3 of 5.28,947,290 KShcob-report-2020-21; PDF p. 377; FY 2020/21; confidence 3 of 5.
SIA-P-062Equipping of Poye, Mbaga, Karapul, Uwasi, Nyamuango, Daho and Angolo Mktmarkets tradeunknowncob-report-2020-21; PDF p. 377; 2021-06-30; confidence 3 of 5.11,432,917 KShcob-report-2020-21; PDF p. 377; FY 2020/21; confidence 3 of 5.
SIA-P-063Drilling of boreholes at Ochienga, Kobonyo, Okela, Bonde, Dhere, Utonga & Kanyichudowater sanitationunknowncob-report-2020-21; PDF p. 377; 2021-06-30; confidence 3 of 5.11,338,862 KShcob-report-2020-21; PDF p. 377; FY 2020/21; confidence 3 of 5.
SIA-P-064Maintenance of River Yala and Lake Kanyaboli dykesenvironmentunknowncob-report-2018-19; PDF p. 272; 2019-06-30; confidence 5 of 5.20,000,000 KShcob-report-2018-19; PDF p. 272; FY 2018/19; confidence 5 of 5.
SIA-P-065Construction of County Annex Siayagovernance officesunknowncob-report-2018-19; PDF p. 272; 2019-06-30; confidence 5 of 5.35,000,000 KShcob-report-2018-19; PDF p. 272; FY 2018/19; confidence 5 of 5.
SIA-P-066Development of East Uyoma Water Project (co-funding of the project)water sanitationunknowncob-report-2018-19; PDF p. 272; 2019-06-30; confidence 5 of 5.10,000,000 KShcob-report-2018-19; PDF p. 272; FY 2018/19; confidence 5 of 5.
SIA-P-067Construction of Pap - Kodero Twin Box Culvert FLroads transportunknowncob-report-2018-19; PDF p. 272; 2019-06-30; confidence 5 of 5.12,119,733 KShcob-report-2018-19; PDF p. 272; FY 2018/19; confidence 5 of 5.
SIA-P-068Routine Maintenance Of Ndai/Kanyaboli/Kubar Pr. Sch. /Obambo Pr. Sch. Roadroads transportunknowncob-report-2018-19; PDF p. 272; 2019-06-30; confidence 5 of 5.8,265,600 KShcob-report-2018-19; PDF p. 272; FY 2018/19; confidence 5 of 5.
SIA-P-069Completion of the Apuoyo animal feed pelletizing plantagriculture fisheriescancelledcob-report-2024-25; PDF p. 483; 2025-06-30; confidence 3 of 5.1,500,000 KShcob-report-2024-25; PDF p. 483; FY 2024/25; confidence 3 of 5.
SIA-P-070Fencing and installation of a gate at Kokach Beachagriculture fisheriessuspendedcob-report-2024-25; PDF p. 483; 2025-06-30; confidence 3 of 5.None held
SIA-P-071Renovation and repairs of the Siriwo rice drying flooragriculture fisheriescancelledcob-report-2024-25; PDF p. 483; 2025-06-30; confidence 3 of 5.None held
SIA-P-072Construction of modern washrooms at Ralayo beachwater sanitationsuspendedcob-report-2024-25; PDF p. 484; 2025-06-30; confidence 3 of 5.None held
SIA-P-073Acquisition of storage tanks for Bondo Sub-County Hospitalhealthsuspendedcob-report-2024-25; PDF p. 484; 2025-06-30; confidence 3 of 5.4,899,401 KShcob-report-2024-25; PDF p. 484; FY 2024/25; confidence 3 of 5.
SIA-P-074Completion of Oboch dispensary (Pending)healthsuspendedcob-report-2024-25; PDF p. 484; 2025-06-30; confidence 3 of 5.3,200,000 KShcob-report-2024-25; PDF p. 484; FY 2024/25; confidence 3 of 5.
SIA-P-075Improving the sewer system and gate at the Rwambwa sub-County hospitalhealthsuspendedcob-report-2024-25; PDF p. 484; 2025-06-30; confidence 3 of 5.1,200,000 KShcob-report-2024-25; PDF p. 484; FY 2024/25; confidence 3 of 5.
SIA-P-077Completion of casualty and maternity complex at Yala SCHhealthdelayedGOV-02-FY2025-26-Q4; PDF p. 11; 2026-06-30; confidence 4 of 5.78,084,128 KShGOV-02-FY2025-26-Q4; PDF p. 11; FY 2025/26; confidence 4 of 5.
SIA-P-078Phased construction of Ugenya Sub County Office at Ukwalagovernance officesunknownGOV-02-FY2025-26-Q4; PDF p. 12; 2026-06-30; confidence 4 of 5.41,233,141.48 KShGOV-02-FY2025-26-Q3; PDF p. 13; FY 2025/26; confidence 4 of 5.
SIA-P-079Phased construction of Gem Sub County Office at Yalagovernance officesdelayedGOV-02-FY2025-26-Q3; PDF p. 13; 2026-03-31; confidence 4 of 5.41,593,818.75 KShGOV-02-FY2025-26-Q3; PDF p. 13; FY 2025/26; confidence 4 of 5.
SIA-P-081Completion of construction and equipping of Municipal Office complex - Phase 2 (multi- year project)urban housing landsdelayedGOV-02-FY2025-26-Q4; PDF p. 12; 2026-06-30; confidence 4 of 5.62,557,284 KShGOV-02-FY2025-26-Q4; PDF p. 12; FY 2025/26; confidence 4 of 5.
SIA-P-082Revamping South Sakwa (Olago)water sanitationdelayedGOV-02-FY2025-26-Q4; PDF p. 12; 2026-06-30; confidence 4 of 5.47,023,421 KShGOV-02-FY2025-26-Q4; PDF p. 12; FY 2025/26; confidence 4 of 5.
SIA-P-092Proposed Construction of Rarieda Sub-County Headquarters in Aramgovernance officessuspendedGOV-02-FY2025-26-Q3; PDF p. 14; 2026-03-31; confidence 4 of 5.39,900,000 KShGOV-02-FY2025-26-Q1; PDF p. 15; FY 2025/26; confidence 4 of 5.
SIA-P-093Purchase of Land for Construction of Rarieda Sub County Officegovernance officessuspendedGOV-02-FY2025-26-Q3; PDF p. 14; 2026-03-31; confidence 4 of 5.5,000,000 KShGOV-02-FY2025-26-Q1; PDF p. 15; FY 2025/26; confidence 4 of 5.
SIA-P-094Completion of Nyamonye juakalimarkets tradesuspendedDisputedGOV-02-FY2025-26-Q4; PDF p. 12; 2026-06-30; confidence 4 of 5.1,878,186.2 KShDisputedcob-report-2024-25; PDF p. 484; FY 2024/25; confidence 3 of 5.
SIA-P-096Wagai Multi-Media Resource and Learning CentreeducationsuspendedGOV-04-CADP-PP; PDF p. 10; 2024-09; confidence 3 of 5.None held
Climate hazard exposure calculated by Takwimu
IndicatorValuePage
PCRA wards with a flood or drought hotspot printed (2023), beside FLLoCA allocations FY 2023/24120 wards (of 30)PDF p. 48 (printed 34)
PCRA wards with a drought hotspot printed (2023), beside FLLoCA allocations FY 2023/2429 wards (of 30)PDF p. 63 (printed 49)
PCRA wards with a flood hotspot printed (2023), beside FLLoCA allocations FY 2023/24318 wards (of 30)PDF p. 48 (printed 34)

Every row: period PCRA 2023; allocations FY 2023/24; source CLIM-01; confidence 3 of 5; Calculated by Takwimu Kenya from published figures; Confidence: the lowest of its inputs.

  1. Formula: Number of distinct wards (CIDP ward register names) whose PCRA ward table lists a flood or drought hotspot with at least one named place; shown beside the FY 2023/24 FLLoCA grant allocations.
  2. Formula: Number of distinct wards (CIDP ward register names) whose PCRA ward table lists a drought hotspot with at least one named place; shown beside the FY 2023/24 FLLoCA grant allocations.
  3. Formula: Number of distinct wards (CIDP ward register names) whose PCRA ward table lists a flood hotspot with at least one named place; shown beside the FY 2023/24 FLLoCA grant allocations.

Interpretation (Takwimu editorial, not a finding)

Stalled public works and ward-level flood and drought hotspots are constraints any investment would have to plan around.

6. Investability screening, market size and returns

Findings

Not assessed. The documents held publish no market sizes, prices, costs, returns or project financial models for Siaya. An investability screen would need them. This section is left empty on purpose rather than filled with assumptions.

7. Risk register (evidence risks)

Canonical topic page: Siaya climate, water and environment (takwimukenya.com/counties/siaya/climate/).

Findings

The risks listed here are risks to the evidence itself: conflicting values and missing data that any decision based on this report would carry. They are taken from the data gaps and conflicts recorded in the data files; no commercial risk is rated.

Water access: figures with different definitions

Water access in Siaya: four figures, four definitions
Value as heldIndicatorSource and pagePeriodConfidence
48.5 percent of de jure populationDrinking water: At least basic service, county (Siaya)KDHS-2022; PDF p. 607 (printed 565)KDHS 2022 fieldwork (Feb-Jul 2022)4 of 5
58 percent of householdsHouseholds with access to safe water (CIDP narrative), county (Siaya)GOV-01-PDF; PDF p. 109 (printed 90)current at plan preparation (CIDP 2023-2027; baseline year not stated in this paragraph)3 of 5
58 percent of populationPopulation with access to quality water supply (CIDP indicator baseline), county (Siaya)GOV-01-PDF; PDF p. 194 (printed 175)2022 (baseline year as printed)3 of 5
62 percent of population in the utility service areaSIBOWASCO (Sibo) water coverage, utility service area (Sibo)WASREB-IMPACT-18; PDF p. 55 (printed 38)FY 2024/254 of 5
34 percent of county populationCounty population served by formalized WSPs, county (Siaya)WASREB-IMPACT-18; PDF p. 89 (printed 72)FY 2024/252 of 5
48.5% (KDHS 2022, at least basic, de jure population), 58% (CIDP, households or population, undefined), 62% (WASREB, SIBOWASCO service area only) and 34% (WASREB, county population served by formal utilities) measure different things. Shown side by side; no canonical figure. All values shown are provisional (see the review notice on the cover); none has been chosen over another.
FLLoCA FY 2025/26: allocation, receipt and transfer to the fund
Value as heldIndicatorSource and pagePeriodConfidence
365,509,163 KShFLLoCA county fund: approved budget allocation, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 10FY 2025/264 of 5
217,509,163 KShFLLoCA-Development: annual targeted revenue, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 2FY 2025/264 of 5
11,000,000 KShFLLoCA-Recurrent: annual targeted revenue, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 2FY 2025/264 of 5
137,000,000 KShFLLoCA-Grant-2025/26: annual targeted revenue, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 3FY 2025/264 of 5
231,601,941 KShFLLoCA county fund: actual disbursements in FY, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 10FY 2025/264 of 5
126,449,101 KShFLLoCA-Development: actual receipts, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 2FY 2025/264 of 5
11,000,000 KShFLLoCA-Recurrent: actual receipts, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 2FY 2025/264 of 5
94,152,840 KShFLLoCA-Grant-2025/26: actual receipts, county (County Government of Siaya)GOV-02-FY2025-26-Q4; PDF p. 3FY 2025/264 of 5
Within the same report the fund allocation equals the three revenue targets and the fund disbursement equals the three receipts. No FLLoCA project expenditure or verified adaptation outcome is published in these documents. All values shown are provisional (see the review notice on the cover); none has been chosen over another.

8. Data gaps

Gaps in the input files of this report, listed and never filled (see how gaps are handled).

ItemReasonData file
Share of national gdp (both, 2019-2024)Not published as a county value. Both editions publish each county’s share of the sum of county GVA (Table 9 in GCP 2025, Table 6 in GCP 2024); GCP excludes taxes on products, so this is not a share of GDP at market prices. KNBS’s own GCP 2024 Figure 2 caption calls it “share of Gross Domestic Product”. Recorded here under its table name.data/siaya-economy.json
Gva by activity (GCP2025, 2020-2021)GCP 2025 annexes give activity values for 2022, 2023 and 2024 only.data/siaya-economy.json
Gva by activity (GCP2024, 2019-2020)GCP 2024 annexes give activity values for 2021, 2022 and 2023 only.data/siaya-economy.json
Gva by activity (both, 2019-2024)No activity breakdown at constant prices is published in either edition.data/siaya-economy.json
Real growth annual (both, 2019-2024)Neither edition prints a year-by-year real growth rate for Siaya; only the period average in a chart. Annual rates are not derived here.data/siaya-economy.json
Yield (t/ha) for any cropNot printed in either acquired source; not derived.data/siaya-agriculture.json
Cotton and sugarcane area and productionNamed as value chains in CIDP 2023-2027 and the 2015 abstract (Table 4.1), but no quantities printed.data/siaya-agriculture.json
Crop area and production 2015-2025No later county statistical abstract acquired; Ministry of Agriculture National Agriculture Production Report 2023-2024 (statistics.kilimo.go.ke) could not be downloaded (connection reset, 21 Nov 2026).data/siaya-agriculture.json
Livestock numbers after 2014No source acquired (2019 Census livestock tables not yet checked).data/siaya-agriculture.json
Fish landings by beach or BMUNo published aggregate by BMU found.data/siaya-agriculture.json
Fisher and boat counts (frame surveys)Only 2000-2004 Kenya-wide LVEMP frame survey reports found (pre-county geography); no county-level frame survey acquired.data/siaya-agriculture.json
Fish landings 2015-2021 and 2023-2025No source acquired.data/siaya-agriculture.json
Irrigated area by scheme (observed)CIDP gives only expansion targets for Muluwa and Anyiko; no National Irrigation Board scheme statistics acquired.data/siaya-agriculture.json
Climate-tagged allocation across all departmentsNo climate budget tagging is published in the CBROP FY 2024/25 or the FY 2025/26 quarterly reports; only FLLoCA grant lines are climate-specific.data/siaya-climate.json
FLLoCA project expenditure and adaptation outcomesNot published in GOV-02/GOV-03 documents read; FLLoCA programme reports not obtained (climatefinanceken.go.ke fails TLS verification).data/siaya-climate.json
FLLoCA FY 2023/24 receiptsNot found in the documents read.data/siaya-climate.json
Ward hazards other than flood and droughtThe PCRA ward tables also list soil erosion, deforestation, strong winds, human-wildlife conflict, pests, mining and others; not yet transcribed row by row.data/siaya-climate.json
PCRA ward tables for Usonga, West Alego, North Ugenya, East Ugenya, Ukwala, Central Sakwa and West AsemboNo ward table is printed for these seven wards in section 2.4.1; some appear only in Annex 2.data/siaya-climate.json
Hazard severity ranking by wardThe PCRA prints no ranking or score by ward.data/siaya-climate.json
Flood impact counts (households affected or displaced, deaths) for SiayaNo Kenya Red Cross, NDMA or NDOC situation report with a Siaya row was obtained; ReliefWeb pages returned HTTP 403. News reports (Tier D) give conflicting counts and are leads only.data/siaya-climate.json
Census 2019 (KPHC Vol IV) water source and sanitation by countyNot downloaded in this pass.data/siaya-climate.json
WASREB sanitation coverage for Siaya (Figure 4.3)Chart labels for Siaya (3% and 7%) cannot be matched to the three series with confidence.data/siaya-climate.json
WASREB Impact 16 (FY 2022/23) utility valuesDownloaded, but its utility tables have no extractable text layer; not read.data/siaya-climate.json
Water coverage before 2022 (ten-year series)Only 2022 (KDHS, CIDP baseline) and FY 2024/25 (WASREB) values extracted so far; KDHS 2014 county tables and earlier Impact reports not yet read.data/siaya-climate.json
Project registerCounty Annual Development Plan 2025/26 (GOV-04 ADP) not obtained: only its public participation report was found. Its Annex 4 lists several hundred ward proposals (ranked wishes, not approved projects); they are not entered as projects.data/siaya-projects.json
Project registerCounty budget implementation reports for FY 2024/25 (GOV-02 Q1 to Q4) and Q4 FY 2023/24 have no project annexes; only FY 2025/26 reports do.data/siaya-projects.json
Project registerController of Budget Siaya tables for FY 2014/15 to 2017/18 and FY 2019/20 were not read for this register.data/siaya-projects.json
Project registerExecutive audit reports for FY 2016/17 to 2018/19 were not found (see data/siaya-audits.json gaps), so early stadium years rest on CoB county data only.data/siaya-projects.json
Project registerNo physical verification by Takwimu. Only one project (SIA-P-038) has an independent statement of completion.data/siaya-projects.json
Project registerCIDP capital projects are programme lines; countywide lines (subsidies, routine maintenance, ECD, VTC and so on) are not entered.data/siaya-projects.json
Project registerBIR rows "Preparation of Valuation Roll" (a study) and CoB FY 2022/23 rows for seeds, fertiliser, tractors and land acquisition (purchases) are not entered.data/siaya-projects.json
pupil_teacher_ratio (pre-primary) after 2019No booklet after 2019 was found; the CIDP gives teachers but no matching enrolment.data/siaya-education.json
primary/secondary GER and NER after 2019No later county table found in the sources read.data/siaya-education.json
primary-to-secondary transition rate (Siaya)The 2019 booklet gives only a national transition rate (Table 11); no county rate was found.data/siaya-education.json
KCSE results (Siaya aggregate)Only KCSE candidate counts (2013, 2014) are published at county level in the sources read; no county grade distribution.data/siaya-education.json
county bursary actual spending by yearBudget implementation reports show no bursary line in FY 2023/24-2025/26 other than the Bursary Fund table; the BROP gives a planned KSh 120 million but no outturn.data/siaya-education.json
VTC enrolment after 2022 (annual)Only CIDP plan-period totals and a 2023 baseline of new students were found.data/siaya-education.json
national TVET enrolment after 2014 (Siaya institutions)No later county figure found.data/siaya-education.json
social protection beneficiaries by programme (Inua Jamii: CT-OVC, OPCT, PWSD-CT)No official county table was found or downloaded; media figures were not used.data/siaya-education.json
youth unemployment rate (Siaya)Only an unsourced overall rate (31.2%) appears in the CIDP; no county-disaggregated youth rate was found.data/siaya-education.json
UNICEF education figures for SiayaUN-01 has no Siaya figure; UN-02 names Siaya only in charts and a diet regression, with no readable education value; UN-03 gives a Siaya adolescent disability share (2.0%), which is not an education indicator.data/siaya-education.json
KNBS Economic Survey county education tablesNot downloaded in this pass.data/siaya-education.json
Siaya County Statistical Abstract after 2015No newer abstract located; the KNBS portal fails certificate verification.data/siaya-education.json
hiv-prevalence (survey-measured)KDHS 2022 did not test for HIV. KENPHIA 2018 county estimates and the Kenya HIV Estimates 2020-2024 reports were not retrieved. Next step: Retrieve KENPHIA 2018 final report county table and the NSDCC estimate reports for 2020-2024.data/siaya-health.json
hiv-viral-suppression (definition)Neither the 2022 poster nor the 2026 profile prints the denominator. Next step: Ask NSDCC/NASCOP for the cascade definitions.data/siaya-health.json
tb-notificationsNTLD-P annual reports show county notification rates only as charts with no text layer. Next step: Read the chart values with the NTLD-P county data team, or request the TIBU county table.data/siaya-health.json
tb-incidence (modelled)No county-level TB incidence estimate found; the 363/100,000 figure is untraced. Next step: Ask the county health department which dataset the syndemic operational plan used.data/siaya-health.json
malaria-prevalence (survey)KDHS 2022 did not test for malaria; the KMIS 2020 report gives prevalence by endemicity zone, not by county. The 'Malaria cluster indicator survey (2022)' named in the CIDP was not found. Next step: Retrieve KMIS 2020 (lake endemic zone) and ask the county which survey gave 29% and 19%.data/siaya-health.json
malaria-incidenceRoutine KHIS confirmed-case data are behind a login. Next step: Request county malaria case counts by year from the county health records office.data/siaya-health.json
health-workforce-per-population (county)The CIDP prints sub-county ratios only, without staff counts or the population base. Next step: Obtain the county HRH establishment (staff counts by cadre) and divide by KNBS population; record both inputs.data/siaya-health.json
chu-functionalityThe county article (HEALTH-02) returns HTTP 404 and the baseline assessment was not obtained. Next step: Request the Lwala/county assessment, definitions, sampling and ward breakdown.data/siaya-health.json
sentinel-site series (PBIDS, HDSS malaria)The PBIDS portal (HEALTH-03) and MESA page (HEALTH-04) link no data tables. Next step: Search peer-reviewed PBIDS/HDSS outputs; record each as sentinel-site.data/siaya-health.json
annual trend 2014-2024Only two KDHS rounds give comparable county survey values; annual routine data were not retrievable. Next step: None without KHIS access; gaps are listed, not filled.data/siaya-health.json

9. Bibliography and document versions

Every document cited by a figure in this report, with the SHA-256 digest of the file version read (conventions).

KeyTitle, publisher, dateSHA-256URLLicence
CIDP-2023County Government of Siaya, County Integrated Development Plan 2023-2027 (final print file). County Government of Siaya. not stated (PDF created 2024-01-24). Period: 2023-2027; statistics 'as at 2022'.650a5bdf71c5d4d43247a837752e0c3f2978d4ef53853033566278e7e6be9d0dhttps://siaya.go.ke/wp-content/uploads/2026/10/County-Government-of-Siaya-CIDP-2023-2027-Final-Print-File-2024.pdf© County Government of Siaya, all rights reserved: link and cite only (terms)
CIDP-2023-2027County Integrated Development Plan 2023-2027 (final print file). County Government of Siaya. 2024-01. Period: 2023-2027 (review of 2018-2022).650a5bdf71c5d4d43247a837752e0c3f2978d4ef53853033566278e7e6be9d0dhttps://siaya.go.ke/wp-content/uploads/2026/10/County-Government-of-Siaya-CIDP-2023-2027-Final-Print-File-2024.pdfAll rights reserved (county site footer): link and cite only (terms)
CLIM-01Siaya County Participatory Climate Risk Assessment (PCRA) Report, 2023. County Government of Siaya, Department of Water, Sanitation, Environment, Natural Resources and Climate Change. 2023 (cover); PDF created 2024-06-19. Period: PCRA ward public participation, 2023.94ac1729fa29f651b4516ffc35dc676238273f3ef66773249a285111f8898313https://maarifa.cog.go.ke/sites/default/files/2024-06/Siaya%20County%20PCRA%20Report%20%28revised%20nakuru%29%20FINAL.pdfNo reuse licence stated: link and cite (terms)
GOV-01-PDFCounty Government of Siaya, County Integrated Development Plan 2023-2027 (final print file). County Government of Siaya. not stated. Period: 2023-2027.650a5bdf71c5d4d43247a837752e0c3f2978d4ef53853033566278e7e6be9d0dhttps://siaya.go.ke/wp-content/uploads/2026/10/County-Government-of-Siaya-CIDP-2023-2027-Final-Print-File-2024.pdf© County Government of Siaya, rights reserved; figures citable, not redistributed (terms)
GOV-02-FY2025-26-Q1County Government of Siaya, Budget Implementation Report for 1st Quarter Ending September 30th 2025. County Government of Siaya (County Treasury). not stated. Period: FY 2025/26, Q1 (July to September 2025).4260b70e6878ada577ce2846c675dc1d4ec4eb8f02f80ffc0bea326dc407d6dehttps://siaya.go.ke/?cgdp_download=31602© County Government of Siaya, rights reserved; figures citable, not redistributed (terms)
GOV-02-FY2025-26-Q3County Government of Siaya, Budget Implementation Report for 3rd Quarter Ending March 31st 2026. County Government of Siaya (County Treasury). not stated. Period: FY 2025/26, Q3 (January to March 2026).6673545008e72d675252dfcaf40908f0853c396fc0f2733683ca1c9873874796https://siaya.go.ke/?cgdp_download=31595© County Government of Siaya, rights reserved; figures citable, not redistributed (terms)
GOV-02-FY2025-26-Q4County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026. County Government of Siaya (County Treasury). not stated. Period: FY 2025/26, Q4 and year to date (to June 2026).4344ce3966b981e0196b1c81b7a209a294239ccaa473d753b7fc5c85170faec3https://siaya.go.ke/?cgdp_download=31593© County Government of Siaya, rights reserved; figures citable, not redistributed (terms)
GOV-04-CADP-PPReport on Public Participation in the Siaya County Annual Development Plan (CADP) 2025-2026. County Government of Siaya (Department of Finance and Economic Planning, Directorate of Public Participation and Petitions). 2024-09. Period: CADP FY 2025/26.fa62a517b5ecf037a8c0022753bd6946dd0279a62a7fee8d240ff49da86da5f7https://siaya.go.ke/?cgdp_download=31438© County Government of Siaya, rights reserved; figures citable, not redistributed (terms)
KDHS-2022Kenya Demographic and Health Survey 2022, Volume 1 [FR380]. Kenya National Bureau of Statistics, Ministry of Health and partners; published by The DHS Program. 2023. Period: Fieldwork February-July 2022.202dd70451a0bd1d782ddcd104201770e7b17cd25de2719b2191035d2e770111https://dhsprogram.com/pubs/pdf/FR380/FR380.pdfThe DHS Program terms of use: link and cite (terms)
KNBS-01-PDFKenya National Bureau of Statistics, Gross County Product 2025. Kenya National Bureau of Statistics. 2025. Period: 2020-2024 estimates.412af7c153b065b0e94cd74124274b12fade03554ccccad6ee50789b23661c2chttps://repository.knbs.or.ke/server/api/core/bitstreams/72010f40-cf27-43cc-a5bd-318a9665a62f/contentCC BY-NC 4.0 (stated in the report and the repository record) (terms)
KNBS-02-PDFKenya National Bureau of Statistics, Gross County Product 2024. Kenya National Bureau of Statistics. 2024. Period: 2019-2023 estimates.fe2dff51a6976cbc60d9aeb35b03c8d3fdc4b927de967bb9ba554c5efe4f8ad8https://repository.knbs.or.ke/server/api/core/bitstreams/a7057585-8e4b-4d07-8c64-418f701710fa/contentCC BY-NC 4.0 (stated in the report and the repository record) (terms)
KNBS-ABS-2015Siaya County Statistical Abstract 2015. Kenya National Bureau of Statistics. 2015. Period: 2013-2014.3e7cfa7105a03dc01ef346ad2ea2aea65cd9b9f7c17614cd15fa9f5b56fddb13https://repository.knbs.or.ke/server/api/core/bitstreams/8d50c7f5-b6c2-4c90-b5d3-a85b8dd7392c/contentCC BY-NC 4.0 (repository record) (terms)
KNBS-CSA-SIAYA-2015Siaya County Statistical Abstract 2015. Kenya National Bureau of Statistics (data from County Government of Siaya departments of Agriculture, Livestock and Fisheries). 2015. Period: 2013-2014.3e7cfa7105a03dc01ef346ad2ea2aea65cd9b9f7c17614cd15fa9f5b56fddb13https://www.maarifa.cog.go.ke/sites/default/files/2026-02/2015-County-Statistical-Abstracts-Siaya.pdfCopyright KNBS, all rights reserved; "Extracts may be used or published if the source is duly acknowledged" (p.ii) (terms)
MOE-BESB-20142014 Basic Education Statistical Booklet. Ministry of Education, Science and Technology. 2015. Period: 2014.3ebf97e5064f8f0110f4859f4422083e6868ef083c421f1deaaae19751112f7bhttps://kicd.ac.ke/wp-content/uploads/2017/10/2014-Basic-Education-Statistical-Booklet.pdfNo licence stated; figures citable, not redistributed (terms)
MOE-BESB-2019Basic Education Statistical Booklet 2019. Ministry of Education (State Department for Early Learning and Basic Education). 2020. Period: 2019.a716c61e7f91aff42205cf861e3a5aee81605b3e7e890b9bcb140360a7724a9ehttps://s3-eu-west-1.amazonaws.com/s3.sourceafrica.net/documents/120844/Kenya-Basic-Education-Statistical-Booklet-2019.pdfNo licence stated; figures citable, not redistributed (terms)
WASREB-IMPACT-18Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18). Water Services Regulatory Board (WASREB). 2026-06. Period: FY 2024/25.93c826ddcf57075968f72814dc9e68cf1f141eec080bccfb7090c928d8d09720https://wasreb.go.ke/wp-content/uploads/2026/06/Impact-18-Report.pdfNo licence stated; figures citable, not redistributed (terms)
audit-2020-21Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021. Office of the Auditor-General. 2022-10-25. Period: FY 2020/21.45a4bd1d40704369a109a82a02bac38304de0bf2e0b05dfd0632e2391b5e0a6bhttps://libraryir.parliament.go.ke/server/api/core/bitstreams/34a55862-85c6-4c3c-9df2-7f0fd6a08c7b/contentNo licence stated; figures citable, not redistributed (terms)
audit-2021-22Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022. Office of the Auditor-General. 2023. Period: FY 2021/22.5066633d5c1201362b6a8520460b8d64918ea901294066ffb28a4b26142d2be7https://libraryir.parliament.go.ke/server/api/core/bitstreams/65a37c0b-e189-4aa0-bfde-f2777b171e69/contentNo licence stated; figures citable, not redistributed (terms)
audit-2022-23Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023.. Office of the Auditor-General. 2024. Period: FY 2022/23.9eb4ed9e61ac1d512142b0a0d6c0df3f6e10535da9f0f0995f4b58bb4b0101e3https://libraryir.parliament.go.ke/server/api/core/bitstreams/bbe0a36b-bb54-443b-9d72-91446d0527f3/contentNo licence stated; figures citable, not redistributed (terms)
audit-2023-24Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024. Office of the Auditor-General. 2025-03-05. Period: FY 2023/24.d467556765db30e52a70ea38d1cb5ffe0dd56022100ec72d240409571fdfbc48https://libraryir.parliament.go.ke/server/api/core/bitstreams/ff966c32-8411-45f1-b2fb-0ecea70de789/contentNo licence stated; figures citable, not redistributed (terms)
audit-2024-25Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025. Office of the Auditor-General. 2025-12-09. Period: year to 30 June 2025.ac77d76f5df088d5ab1f07d4e0b045abeaa752bf60cc8be693bf20d18bfecabehttps://libraryir.parliament.go.ke/items/a8d4bb86-fc16-43f1-b109-97514df5e868Not stated: link and cite only (terms)
audit-asm-2022-23Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023. Office of the Auditor-General. 2024-02-14. Period: year to 30 June 2023.f29e0ab2e2893169a6c79fbeb9511bd5d089a568936b75dd8a13920c89dfd6cahttps://libraryir.parliament.go.ke/items/2ffcd198-5520-4407-abcf-a3bba6ebc66eNot stated: link and cite only (terms)
audit-asm-2023-24Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024. Office of the Auditor-General. 2024-12-27. Period: year to 30 June 2024.4854ae471a643b06f170b333f383a312e0eb7f77d454b0a03246d32466dac3b5https://libraryir.parliament.go.ke/items/d97ee62e-564b-4a6b-a84a-b66cba4b9883Not stated: link and cite only (terms)
cob-report-2018-19Annual County Governments Budget Implementation Review Report FY 2018/19. Office of the Controller of Budget. 2019. Period: FY 2018/19.7d8c1a0b35e2ca42b53dfa0b6979b4f37c57db61c60e142e727e7b3f29c19798https://libraryir.parliament.go.ke/server/api/core/bitstreams/ac5966ef-fbc8-4b35-9712-c4b8bd838ebd/contentNo licence stated; figures citable, not redistributed (terms)
cob-report-2020-21County Governments Budget Implementation Review Report FY 2020/21. Office of the Controller of Budget. 2022-01-25. Period: FY 2020/21.498e5e003147fbdb7da09c8a9079a1f940a09aa87076673255da3a2c54937868https://libraryir.parliament.go.ke/server/api/core/bitstreams/fa13464d-84c7-492c-a336-b65c902ddfbe/contentNo licence stated; figures citable, not redistributed (terms)
cob-report-2022-23Annual County Governments Budget Implementation Review Report FY 2022/23. Office of the Controller of Budget. 2024-04-23. Period: FY 2022/23.385285d52418d94b8f72379a51dfacbbd4d11f8926840049269fa388dd47d9dahttps://libraryir.parliament.go.ke/server/api/core/bitstreams/ea1fa5f7-1c31-4851-aaa3-ad14a40b0fe7/contentNo licence stated; figures citable, not redistributed (terms)
cob-report-2023-24County Governments Budget Implementation Review Report FY 2023/24. Office of the Controller of Budget. 2024-09-18. Period: FY 2023/24.7a9690d049576fa1346a54da71f52c1742cdb01e154b99139cd1d445cbd6102fhttps://libraryir.parliament.go.ke/server/api/core/bitstreams/8dff45e0-0da9-4344-a141-4bc9c0e411e7/contentNo licence stated; figures citable, not redistributed (terms)
cob-report-2024-25County Governments Budget Implementation Review Report FY 2024/25. Office of the Controller of Budget. 2025-09-23. Period: FY 2024/25.b69858e28e2c59de961f39e749e9885462e5608e9db2291b807040cc59a35f5chttps://libraryir.parliament.go.ke/server/api/core/bitstreams/3458a286-34f3-45fd-9d9d-d8215c6f8d11/contentNo licence stated; figures citable, not redistributed (terms)

10. Snapshot, method and licence

Snapshot ID da3d831b453a identifies the input files below and the review state of every value at the time of printing (review state: 283 provisional, 0 approved, 87 disputed, 0 superseded, 0 withdrawn). How it is computed, the method, the confidence scales and the licence are at How to read these reports (takwimukenya.com/reports/method/). This report contains no personal data and names no contractor or individual.

Input fileSHA-256
data/reviews.jsonc9d511495ad60dfa3ea068a7c29087763cfd4b661f9b099d7fd323d3b672e72d
data/siaya-agriculture.json107bcb546b0ee746230832cf58872cfa053db7543e7b012f5e55a7ef7f708082
data/siaya-climate.json241d781daa2579da92ec5c92494d46f56a94f8797f8df980305f5fc0c8ff6e6a
data/siaya-economy.json650193fab4a5855218eeb9e41481ef8a26eb7f46289fd895e351d5c8230e7780
data/siaya-education.json39bb1f52fd957ceee08b70a47342a8228af275d97473d4721d3ec627972cbdab
data/siaya-health.jsone946ebaa40d3ba3ed86eea356d8a6be22f2514dcb878d44666ab21a20409fafd
data/siaya-projects.json5e9124b9507bcc1279d671881177911fafbf8134ef520ae677f5f19d2ef85023
data/source-library.json3504c8e0b46ea08561b9eaf3e4de380fb86b8f3cc8dfb52de64f197cd15f4061
data/source-manifest.json297f4e588ef28ba71ce68960b2c4f476bb143f678c85e8edf12c50efa4bbe8cd
review state (lib/review-status.js)c4c5999885c9455aa47d12ef0c98a257d2b6260d2fa60949ac40d55ea54d5c54