Climate, water and resilience

Where residents of Siaya told the county’s climate risk assessment that floods and drought hit, how many people have safe water and sanitation by each official definition, and what climate money has been planned, received, transferred and spent.

Abbreviations on this page: PCRA, Participatory Climate Risk Assessment; FLLoCA, Financing Locally-Led Climate Action.

How to read this page

Provisional: awaiting editorial review Editorial review of 87 values: 0 approved, 87 pending, 0 rejected. What this means

Flood and drought hotspots by ward, as printed

23 of the 30 wards have a ward table in the PCRA that names a flood or drought hazard. The order below is alphabetical, not a ranking.

Siaya ward flood and drought hotspots as printed in the PCRA 2023
WardHazard as printedHotspots as printedRankingSource and page
Central Alego
Alego Usonga
Soil degradation, flooding (sanitation and health issues)Lake Kanyaboli; Ndaye; Obambo; Kandenje; Got Aduwa; Ndere dispensarynot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 48 (printed p. 34), confidence 4 of 5
Central Gem
Gem
Floods and gulleysSiriwo; Luri; Nyandiwa; Farms around River Yalanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 66 (printed p. 52), confidence 4 of 5
East Asembo
Rarieda
Drought and drying up of riversKianja, Nyandiwa, Pap Otere, and Kakonyanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 63 (printed p. 49), confidence 4 of 5
East Gem
Gem
FloodsRiver Dhene; River Awach; Uranganot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 65 (printed p. 51), confidence 4 of 5
East Yimbo
Bondo; Same spelling as CIDP; the IEBC gazette order 'Yimbo East' has not been checked against a downloaded IEBC register
DroughtEntire East Yimbonot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 58 (printed p. 44), confidence 4 of 5
East Yimbo
Bondo; Same spelling as CIDP; IEBC form not checked
FloodingNyamonye; Usigunot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 58 (printed p. 44), confidence 4 of 5
North Alego
Alego Usonga
Flooding {mosquito breeding grounds) [Public Health row]Lowlands of North Alegonot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 51 (printed p. 37), confidence 4 of 5
North Gem
Gem
Prolonged drought and unreliable rainfall patternsBarkotako areanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 64 (printed p. 50), confidence 4 of 5
North Gem
Gem
FloodsBaoMoja Kisendo Rd; BoaMoja Mundoware Rd; Barkotakonot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 64 (printed p. 50), confidence 4 of 5
North Sakwa
Bondo
Droughtnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 59 (printed p. 45), confidence 4 of 5
North Sakwa
Bondo
Flooding and siltingMajiwa areanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 59 (printed p. 45), confidence 4 of 5
North Uyoma
Rarieda
Droughtnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 60 (printed p. 46), confidence 4 of 5
Siaya Township
Alego Usonga; CIDP 2023-2027 (pdf p.28) prints this ward as 'Township'
Drought (Drying of water sources, increased heat stress, death of livestock, low agricultural yields, reduced water level in the rivers, ...)Entire Siaya Township Wardnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 54 (printed p. 40), confidence 4 of 5
Siaya Township
Alego Usonga; CIDP 2023-2027 (pdf p.28) prints this ward as 'Township'; PCRA Annex 3 prints 'Tow nship'
Flooding (leading to Poor soil quality, Soil erosion, Siltation of dams, Outbreak of health problems, Water pollution.)Ufinya damnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 54 (printed p. 40), confidence 4 of 5
Sidindi
Ugunja
DroughtEntire wardnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 57 (printed p. 43), confidence 4 of 5
Sigomere
Ugunja
Droughtnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 57 (printed p. 43), confidence 3 of 5
Sigomere
Ugunja; PCRA Annex 2 (pdf p.95-96) spells it 'Sigomre'; the ward table heading and CIDP use 'Sigomere'
Floodingnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 56 (printed p. 42), confidence 4 of 5
South East Alego
Alego Usonga
Drought and drying of seasonal streams leading to water shortage and inadequate water supplyBugo, Yawo Lwanda, Ongala, Ranyadha, Ongoro, Ang’ech, Mbeji, Wadhnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 52 (printed p. 38), confidence 3 of 5
South East Alego
Alego Usonga
Floods leading to outbreak of diseases e.g cholera, malaria, bilharzia, amoeba, pneumonia & anthrax and skin diseases in livestockMur Malanga market; Bar Olengo market; Nyang’oma marketnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 52 (printed p. 38), confidence 4 of 5
South Gem
Gem
Soil erosion and floodingOngoronot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 66 (printed p. 52), confidence 4 of 5
South Sakwa
Bondo
Droughtnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 60 (printed p. 46), confidence 4 of 5
South Sakwa
Bondo
Flooding and siltingDestruction of properties; houses, roads, bridges, schools and loss of lives in Gombe and Migwena areasnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 60 (printed p. 46), confidence 4 of 5
South Uyoma
Rarieda
Drought and drying up of riversnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 62 (printed p. 48), confidence 4 of 5
South Uyoma
Rarieda
FloodingAbururu; Ndigwa Majenga Rd; Ranyala Madundu Rd; Otieno SIbuor Nyamanga Rd; KaminOningo Beach; Koguta Juction Wikwang Rd; Lieta Mumbo Rd; Lweya Kobonde Madiany Rd; Ndigwa Buru Rd; Otumba rd; Kobel Aora Korwa Rd; Wio Mino Rd, Chamakwaro Kolilo Rd, Kawater Kadiala Beach Rd; Rahongo Kadiala Beach Rdnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 62 (printed p. 48), confidence 3 of 5
Ugunja
Ugunja
DroughtEntire Ugunja wardnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 56 (printed p. 42), confidence 4 of 5
Ugunja
Ugunja
FloodingUgunja town; Ambira areanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 55 (printed p. 41), confidence 4 of 5
West Gem
Gem
Prolonged drought and unreliable rainfall patternsEntire West Gem; Komuok area; Ujwang’a area; Nyapiedho; Dienya; Wangojinot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 64 (printed p. 50), confidence 3 of 5
West Gem
Gem
FloodsKomito and Ochuoga streamsnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 65 (printed p. 51), confidence 4 of 5
West Sakwa
Bondo
FloodingKapiyo; Marandanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 59 (printed p. 45), confidence 4 of 5
West Ugenya
Ugenya
DroughtEntire West Ugenyanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 55 (printed p. 41), confidence 4 of 5
West Ugenya
Ugenya
FloodingSifuyo; Mlango; Many parts of Ugenyanot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 55 (printed p. 41), confidence 4 of 5
West Uyoma
Rarieda
Drought and unreliable rainfall patternsnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 61 (printed p. 47), confidence 4 of 5
West Yimbo
Bondo
Droughtnone printednot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 58 (printed p. 44), confidence 4 of 5
West Yimbo
Bondo
FloodingGot Agulu sub locationnot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 58 (printed p. 44), confidence 4 of 5
Yala Township
Gem
Floods and gulleysUlumbi; Bar Sauri; Lueronot ranked: hazards are listed by sector in each ward table, no order of severity is printedSiaya County Participatory Climate Risk Assessment (PCRA) Report, 2023, PDF p. 66 (printed p. 52), confidence 4 of 5

Wards with no ward table in the PCRA (7)

No hazard is recorded for these wards: the report prints no ward table for them, and some appear only in its annex. That is a gap, not an absence of risk. Find any ward on the ward map.

County and sub-county hazard statements

The PCRA’s county hazard list and the only ranking words it uses, quoted as printed.

PCRA county and sub-county hazard statements as printed
MeasureValuePeriodPage and confidence
hazard listed in PCRA Table 2: FloodingS/NO. 1 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 37 (printed p. 23), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Lake victioria; River Nzoia
hazard listed in PCRA Table 2: Soil erosionS/NO. 2 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 37 (printed p. 23), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Rainfall
hazard listed in PCRA Table 2: Loss of biodiversity eg fishS/NO. 3 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 37 (printed p. 23), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Warming of the lake; Overdependence of fish (wrong fishing nets)
hazard listed in PCRA Table 2: Drought (year)S/NO. 4 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 37 (printed p. 23), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Prolonged dry seasons
hazard listed in PCRA Table 2: Pest & diseases eg army worm & dodder plantS/NO. 5 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 37 (printed p. 23), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Seasons
hazard listed in PCRA Table 2: High temperaturesS/NO. 6 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 38 (printed p. 24), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Prolonged dry seasons
hazard listed in PCRA Table 2: Unpredictability of rainfall frequencies intensifiedS/NO. 7 (serial number in the table, not a severity rank)PCRA ward public participation, 2023Table 2 current and Historic hazards/Risks experienced mentioned in the ward public participations, PDF p. 38 (printed p. 24), confidence 4 of 5
Hazard named in ward public participation; cause as printed: Weather unpredictability
hazard named as the major current hazard: unpredictable onset of rainfall and durations of the dry season'the major current hazard'PCRA ward public participation, 2023Section 2.1 Historical and Current Climate Hazards and Trends (narrative), PDF p. 36 (printed p. 22), confidence 3 of 5
Narrative summary of ward contributions; no scoring method is described
hazard regarded by respondents as the worst hazard: Drought'the worst hazard'PCRA ward public participation, 2023Summary of county risk profile (narrative after Table 6), PDF p. 67 (printed p. 53), confidence 3 of 5
Respondents' perception; no scoring method is described
hazard perceived as the most dominant: Disease outbreaks: HIV/AIDS'perceived to be the most dominant hazard'PCRA ward public participation, 2023Summary of county risk profile (narrative after Table 6), PDF p. 67 (printed p. 53), confidence 3 of 5
Perception; the same paragraph calls malaria 'the lead problem' Disease figures in this paragraph (15.3% HIV, 46% malaria) are quoted from other surveys and are not taken into this file; see data/siaya-health.json
ward adaptation priority: affected wards: FloodsNo. 7 (row number in Annex 2, not a severity rank)PCRA ward public participation, 2023Annex 2: Ward Adaptation Priorities (Risk / Proposed Intervention / Affected Wards), PDF p. 96 (printed p. 82), confidence 4 of 5
Wards named as affected in the adaptation-priorities annex
ward adaptation priority: affected wards: Drying up of streamsNo. 8 (row number in Annex 2, not a severity rank)PCRA ward public participation, 2023Annex 2: Ward Adaptation Priorities (Risk / Proposed Intervention / Affected Wards), PDF p. 96 (printed p. 82), confidence 4 of 5
Wards named as affected in the adaptation-priorities annex
ward adaptation priority: affected wards: Prolonged Dry Spells causing livestock deathsNo. 10 (row number in Annex 2, not a severity rank)PCRA ward public participation, 2023Annex 2: Ward Adaptation Priorities (Risk / Proposed Intervention / Affected Wards), PDF p. 97 (printed p. 83), confidence 4 of 5
Wards named as affected in the adaptation-priorities annex
ward adaptation priority: affected wards: Lake Water RisesNo. 12 (row number in Annex 2, not a severity rank)PCRA ward public participation, 2023Annex 2: Ward Adaptation Priorities (Risk / Proposed Intervention / Affected Wards), PDF p. 97 (printed p. 83), confidence 4 of 5
Wards named as affected in the adaptation-priorities annex
Source for every row: Siaya County Participatory Climate Risk Assessment (PCRA) Report, 2023.

Water and sanitation coverage, by definition

48.5% (KDHS 2022, at least basic, de jure population), 58% (CIDP, households or population, undefined), 62% (WASREB, SIBOWASCO service area only) and 34% (WASREB, county population served by formal utilities) measure different things. Shown side by side; no canonical figure.

Siaya water access: figures side by side with their definitions
FigureValueDefinition as givenSource and page
drinking water: At least basic service
KDHS 2022 fieldwork (Feb-Jul 2022); Siaya
48.5 percent of de jure populationWHO/UNICEF JMP drinking water service ladder. At least basic = improved source with water on premises or round trip of 30 minutes or less (includes safely managed); limited = improved source, round trip over 30 minutes or unknown; unimproved = unprotected dug well or spring; surface waterKenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.2C Drinking water service ladder by county (percent distribution of de jure population), PDF p. 607 (printed p. 565), confidence 4 of 5
households with access to safe water (CIDP narrative)
current at plan preparation (CIDP 2023-2027; baseline year not stated in this paragraph); Siaya
58 percent of householdsCIDP does not define 'safe water' or name the source of the 58%County Integrated Development Plan 2023-2027 (final print file), Section 4.1.4 Water, Environment and Natural Resources, Sector Introduction, PDF p. 109 (printed p. 90), confidence 3 of 5
population with access to quality water supply (CIDP indicator baseline)
2022 (baseline year as printed); Siaya
58 percent of populationIndicator baseline; definition and source not stated. Mid-term 61% and end-term 65% are targets and are not recordedCounty Integrated Development Plan 2023-2027 (final print file), CIDP results matrix, Water and Environment: 'Percentage of the population with access to quality water supply', PDF p. 194 (printed p. 175), confidence 3 of 5
SIBOWASCO (Sibo) water coverage
FY 2024/25; Sibo
62 percent of population in the utility service areaWASREB water coverage = population served / population in the utility's service area; covers SIBOWASCO's area only, not the whole countyImpact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Key performance indicators of public utilities (DWQ, NRW, Water Coverage, ...), row 'Sibo', PDF p. 55 (printed p. 38), confidence 4 of 5
county population served by formalized WSPs
FY 2024/25; Siaya
34 percent of county populationShare of the whole county population served by formalized water service providers; the rest (66%) is shown as not served by a WSP, which does not mean without waterImpact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Figure 4.2: Water Coverage within all counties (bar label), PDF p. 89 (printed p. 72), confidence 2 of 5

Every coverage value

Siaya water and sanitation coverage values, all sources
MeasureValuePeriodSource, page and confidence
drinking water: At least basic service48.5 percent of de jure population Machine cross-checkedKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.2C Drinking water service ladder by county (percent distribution of de jure population), PDF p. 607 (printed p. 565), confidence 4 of 5
WHO/UNICEF JMP drinking water service ladder. At least basic = improved source with water on premises or round trip of 30 minutes or less (includes safely managed); limited = improved source, round trip over 30 minutes or unknown; unimproved = unprotected dug well or spring; surface water n = 2,703 de jure persons (unweighted base as printed)
drinking water: Limited service7 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.2C Drinking water service ladder by county (percent distribution of de jure population), PDF p. 607 (printed p. 565), confidence 4 of 5
WHO/UNICEF JMP drinking water service ladder. At least basic = improved source with water on premises or round trip of 30 minutes or less (includes safely managed); limited = improved source, round trip over 30 minutes or unknown; unimproved = unprotected dug well or spring; surface water n = 2,703 de jure persons (unweighted base as printed)
drinking water: Unimproved1.8 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.2C Drinking water service ladder by county (percent distribution of de jure population), PDF p. 607 (printed p. 565), confidence 4 of 5
WHO/UNICEF JMP drinking water service ladder. At least basic = improved source with water on premises or round trip of 30 minutes or less (includes safely managed); limited = improved source, round trip over 30 minutes or unknown; unimproved = unprotected dug well or spring; surface water n = 2,703 de jure persons (unweighted base as printed)
drinking water: Surface water42.7 percent of de jure population Machine cross-checkedKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.2C Drinking water service ladder by county (percent distribution of de jure population), PDF p. 607 (printed p. 565), confidence 4 of 5
WHO/UNICEF JMP drinking water service ladder. At least basic = improved source with water on premises or round trip of 30 minutes or less (includes safely managed); limited = improved source, round trip over 30 minutes or unknown; unimproved = unprotected dug well or spring; surface water n = 2,703 de jure persons (unweighted base as printed)
sanitation: At least basic service35 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.7C Sanitation service ladder by county (percent distribution of de jure population), PDF p. 615 (printed p. 573), confidence 4 of 5
WHO/UNICEF JMP sanitation ladder. At least basic = improved facility not shared with other households (includes safely managed); limited = improved facility shared by 2 or more households; unimproved; open defecation n = 2,703 de jure persons
sanitation: Limited service19.7 percent of de jure population Machine cross-checkedKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.7C Sanitation service ladder by county (percent distribution of de jure population), PDF p. 615 (printed p. 573), confidence 4 of 5
WHO/UNICEF JMP sanitation ladder. At least basic = improved facility not shared with other households (includes safely managed); limited = improved facility shared by 2 or more households; unimproved; open defecation n = 2,703 de jure persons
sanitation: Unimproved39 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.7C Sanitation service ladder by county (percent distribution of de jure population), PDF p. 615 (printed p. 573), confidence 4 of 5
WHO/UNICEF JMP sanitation ladder. At least basic = improved facility not shared with other households (includes safely managed); limited = improved facility shared by 2 or more households; unimproved; open defecation n = 2,703 de jure persons
sanitation: Open defecation6.2 percent of de jure populationKDHS 2022 fieldwork (Feb-Jul 2022)Kenya Demographic and Health Survey 2022, Volume 1 [FR380], Table 16.7C Sanitation service ladder by county (percent distribution of de jure population), PDF p. 615 (printed p. 573), confidence 4 of 5
WHO/UNICEF JMP sanitation ladder. At least basic = improved facility not shared with other households (includes safely managed); limited = improved facility shared by 2 or more households; unimproved; open defecation n = 2,703 de jure persons
households with access to safe water (CIDP narrative)58 percent of householdscurrent at plan preparation (CIDP 2023-2027; baseline year not stated in this paragraph)County Integrated Development Plan 2023-2027 (final print file), Section 4.1.4 Water, Environment and Natural Resources, Sector Introduction, PDF p. 109 (printed p. 90), confidence 3 of 5
CIDP does not define 'safe water' or name the source of the 58% Target in the same paragraph: 65% in five years (a target, not recorded as a value)
population with access to quality water supply (CIDP indicator baseline)58 percent of population2022 (baseline year as printed)County Integrated Development Plan 2023-2027 (final print file), CIDP results matrix, Water and Environment: 'Percentage of the population with access to quality water supply', PDF p. 194 (printed p. 175), confidence 3 of 5
Indicator baseline; definition and source not stated. Mid-term 61% and end-term 65% are targets and are not recorded Same 58% as the narrative, but the narrative says households and this table says population
households with access to safe drinking water (CIDP indicator baseline)144,273 households Machine cross-checked2022 (baseline year as printed)County Integrated Development Plan 2023-2027 (final print file), CIDP results matrix, Water and Environment: 'No of households with access to safe drinking water', PDF p. 194 (printed p. 175), confidence 3 of 5
Count of households; definition and source not stated. 151,735 and 161,685 are targets and are not recorded
SIBOWASCO (Sibo) water coverage62 percent of population in the utility service areaFY 2024/25Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Key performance indicators of public utilities (DWQ, NRW, Water Coverage, ...), row 'Sibo', PDF p. 55 (printed p. 38), confidence 4 of 5
WASREB water coverage = population served / population in the utility's service area; covers SIBOWASCO's area only, not the whole county
population in SIBOWASCO service area593,624 persons Machine cross-checkedFY 2024/25Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Table 3.2: General Data on WSPs, row 'Sibo', PDF p. 53 (printed p. 36), confidence 4 of 5
Total population in service area as reported by the utility to WASREB
population served by SIBOWASCO368,306 persons Machine cross-checkedFY 2024/25Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Table 3.2: General Data on WSPs, row 'Sibo', PDF p. 53 (printed p. 36), confidence 4 of 5
Total population served as reported by the utility to WASREB 368,306 / 593,624 = 62.0%, consistent with the printed 62% coverage
county population served by formalized WSPs34 percent of county populationFY 2024/25Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Figure 4.2: Water Coverage within all counties (bar label), PDF p. 89 (printed p. 72), confidence 2 of 5
Share of the whole county population served by formalized water service providers; the rest (66%) is shown as not served by a WSP, which does not mean without water Value read from a chart label (Siaya 34% / 66%)
population in low-income areas (LIA) of WSP service areas67,722 persons Machine cross-checkedFY 2024/25Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Table 4.1 Counties with WSPs that met the LIA threshold, PDF p. 92 (printed p. 75), confidence 4 of 5
Population living in utility-designated low-income areas
population served in low-income areas with water services63,443 persons Machine cross-checkedFY 2024/25Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18), Table 4.1 Counties with WSPs that met the LIA threshold, PDF p. 92 (printed p. 75), confidence 4 of 5
Population served with water services within the LIA

Climate and water money, by kind

“Climate-specific” here means the Financing Locally-Led Climate Action (FLLoCA) grant lines only. Water and environment department totals are sector budgets, not climate tags. No FLLoCA project spending or adaptation outcome is published in the documents read.

Allocations (budget estimates and targets)

Money planned in a budget. An allocation is not money received, not spending and not an outcome.

Siaya climate and water money: allocation
MeasureValuePeriodSource, page and confidence
FLLoCA County Climate Resilience Investment (CCRI) grant: estimate137,500,000 KSh Machine cross-checkedFY 2023/24County Budget Review and Outlook Paper for FY 2024/25, Revenue estimates table (columns 'Baseline Estimates 2023/24' and 'Projected Estimates 2024/25'), row 'Financing Locally Led Climate Action (FLLoCA)-CCRI', PDF p. 13, confidence 4 of 5
Climate-specific grant line in the revenue estimates; an allocation, not money received or spent
FLLoCA County Climate Resilience Investment (CCRI) grant: estimate137,000,000 KSh Machine cross-checkedFY 2024/25County Budget Review and Outlook Paper for FY 2024/25, Table 7: Performance of conditional grants, column 'Estimates 2024/25 (A)', PDF p. 17, confidence 4 of 5
Climate-specific grant line; the same 137,000,000 also appears on pdf p.13 as the projected estimate
FLLoCA County Climate Institutional Support (CCIS) grant: estimate11,000,000 KSh Machine cross-checkedFY 2023/24County Budget Review and Outlook Paper for FY 2024/25, Revenue estimates table, row 'FLLOCA-CCIS', column 'Baseline Estimates 2023/24', PDF p. 13, confidence 4 of 5
Climate institutional-support grant line; the 2024/25 column shows 0 Table 7 (pdf p.17) shows '-' for both estimate and receipt in FY 2024/25
Water, Irrigation, Environment, Climate Change & Natural Resources (department): total budget (recurrent + development)798,990,328 KSh Machine cross-checkedFY 2024/25County Budget Review and Outlook Paper for FY 2024/25, Table 10: Departmental budget performance, column 'Total', PDF p. 21, confidence 4 of 5
Sector allocation for the whole department; not climate-tagged. Recurrent 88,208,148 + development 710,782,180
Water, Irrigation, Environment, Climate Change & Natural Resources (department): development budget710,782,180 KSh Machine cross-checkedFY 2024/25County Budget Review and Outlook Paper for FY 2024/25, Table 11: Departmental Development budget performance, column 'Budget', PDF p. 22, confidence 4 of 5
Development allocation for the department; not climate-tagged
FLLoCA-Development: annual targeted revenue217,509,163 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.1: Siaya County, Revenue Performance in FY 2025/26, column 'Annual Targeted Revenue (Kshs.)' (A), PDF p. 2, confidence 4 of 5
Grant amount budgeted as revenue; an allocation, not money received or spent
FLLoCA-Recurrent: annual targeted revenue11,000,000 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.1: Siaya County, Revenue Performance in FY 2025/26, column 'Annual Targeted Revenue (Kshs.)' (A), PDF p. 2, confidence 4 of 5
Grant amount budgeted as revenue; an allocation, not money received or spent
FLLoCA-Grant-2025/26: annual targeted revenue137,000,000 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.1: Siaya County, Revenue Performance in FY 2025/26, column 'Annual Targeted Revenue (Kshs.)' (A), PDF p. 3, confidence 4 of 5
Grant amount budgeted as revenue; an allocation, not money received or spent
FLLoCA county fund: approved budget allocation365,509,163 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.6: Performance of Siaya County Established Funds in FY 2025/26, row 'Financing Locally Led Climate Action (FLLoCA)' (established 2022), PDF p. 10, confidence 4 of 5
Approved budget allocation to the county FLLoCA fund Equals the sum of the three FLLoCA revenue targets in Table 0.1 (217,509,163 + 11,000,000 + 137,000,000)
Water, Irrigation, Environment & Natural Resources (department): recurrent revised budget91.59 KSh million Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.10: Siaya County, Budget Allocation and Absorption Rate by Department in FY 2025/26 (Kshs. million), PDF p. 13, confidence 4 of 5
Sector allocation (not climate-tagged)
Water, Irrigation, Environment & Natural Resources (department): development revised budget858.11 KSh million Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.10: Siaya County, Budget Allocation and Absorption Rate by Department in FY 2025/26 (Kshs. million), PDF p. 13, confidence 4 of 5
Sector allocation (not climate-tagged)

Receipts (grant cash received)

Money the county received from a grant during the year. A receipt is not spending.

Siaya climate and water money: receipt
MeasureValuePeriodSource, page and confidence
FLLoCA CCRI grant: amount received30,222,034 KSh Machine cross-checkedFY 2024/25County Budget Review and Outlook Paper for FY 2024/25, Table 7: Performance of conditional grants, column 'Receipt 2024/25 (B)', PDF p. 17, confidence 4 of 5
Cash received from the grant during the year; not expenditure. Variance printed: -106,777,966
FLLoCA-Development: actual receipts126,449,101 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.1: Siaya County, Revenue Performance in FY 2025/26, column 'Actual Receipts (Kshs.)' (B), PDF p. 2, confidence 4 of 5
Cash received from the grant (accrual basis as printed); not expenditure
FLLoCA-Recurrent: actual receipts11,000,000 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.1: Siaya County, Revenue Performance in FY 2025/26, column 'Actual Receipts (Kshs.)' (B), PDF p. 2, confidence 4 of 5
Cash received from the grant (accrual basis as printed); not expenditure
FLLoCA-Grant-2025/26: actual receipts94,152,840 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.1: Siaya County, Revenue Performance in FY 2025/26, column 'Actual Receipts (Kshs.)' (B), PDF p. 3, confidence 4 of 5
Cash received from the grant (accrual basis as printed); not expenditure

Transfers into the county FLLoCA fund

Money disbursed into the fund. A transfer is not spending on projects and not an outcome.

Siaya climate and water money: transfer
MeasureValuePeriodSource, page and confidence
FLLoCA county fund: actual disbursements in FY231,601,941 KSh Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.6: Performance of Siaya County Established Funds in FY 2025/26, row 'Financing Locally Led Climate Action (FLLoCA)' (established 2022), PDF p. 10, confidence 4 of 5
Money disbursed into the fund; a transfer, not spending on projects or an outcome Equals the sum of the three FLLoCA receipts in Table 0.1 (126,449,101 + 11,000,000 + 94,152,840). Fund financial statements: 'Yes'
FLLoCA county fund: cumulative disbursements to the fund470,842,789 KSh Machine cross-checkedSince establishment (2022) to 30 June 2026County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.6: Performance of Siaya County Established Funds in FY 2025/26, row 'Financing Locally Led Climate Action (FLLoCA)' (established 2022), PDF p. 10, confidence 4 of 5
Cumulative transfers into the fund; not expenditure

Expenditure (actual department spending)

Money spent, as reported. Spending says nothing by itself about what was achieved.

Siaya climate and water money: expenditure
MeasureValuePeriodSource, page and confidence
Water, Irrigation, Environment, Climate Change & Natural Resources (department): actual expenditure350,269,042 KSh Machine cross-checkedFY 2024/25County Budget Review and Outlook Paper for FY 2024/25, Table 10: Departmental budget performance, column 'Actual Exp', PDF p. 21, confidence 4 of 5
Actual expenditure; says nothing about outcomes. Printed absorption 43.8%
Water, Irrigation, Environment, Climate Change & Natural Resources (department): development actual expenditure265,338,562 KSh Machine cross-checkedFY 2024/25County Budget Review and Outlook Paper for FY 2024/25, Table 11: Departmental Development budget performance, column 'Actual Expenditure', PDF p. 22, confidence 4 of 5
Development expenditure; printed absorption 37.3%
Water, Irrigation, Environment & Natural Resources (department): recurrent expenditure46.7 KSh million Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.10: Siaya County, Budget Allocation and Absorption Rate by Department in FY 2025/26 (Kshs. million), PDF p. 13, confidence 4 of 5
Actual expenditure (accrual basis); says nothing about outcomes
Water, Irrigation, Environment & Natural Resources (department): development expenditure144.37 KSh million Machine cross-checkedFY 2025/26County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026, Table 0.10: Siaya County, Budget Allocation and Absorption Rate by Department in FY 2025/26 (Kshs. million), PDF p. 13, confidence 4 of 5
Actual expenditure (accrual basis); says nothing about outcomes

FLLoCA FY 2025/26: allocation, receipt and transfer to the fund. Within the same report the fund allocation equals the three revenue targets and the fund disbursement equals the three receipts. No FLLoCA project expenditure or verified adaptation outcome is published in these documents.

What is not published or not yet found

Sources: Siaya County Participatory Climate Risk Assessment (PCRA) Report, 2023; County Government of Siaya, County Integrated Development Plan 2023-2027 (final print file); County Budget Review and Outlook Paper for FY 2024/25; County Government of Siaya, Budget Implementation Report for 4th Quarter Ending June 30th 2026; Kenya Demographic and Health Survey 2022, Volume 1 [FR380]; Impact: A Performance Report of Kenya's Water Services Sector 2024/2025 (Impact 18). The PCRA is linked from the Council of Governors copy; the register address fails certificate checks. Every value is in the dataset catalogue and in siaya-climate.json.