Audit findings
What the Auditor-General reported on the accounts of the County Executive and the County Assembly of Siaya: the opinion for each year, the findings by category, and the matters later reports list as still unresolved.
How to read this page
Provisional: awaiting editorial review Editorial review of 282 values: 0 approved, 282 pending, 0 rejected. What this means
- Audit findings are findings, not convictions. Each finding is what the Auditor-General reported at the time, often with the county’s management response in the same report. It is not a finding of guilt, and some matters are later explained or resolved. No individual is named on this page; offices and public bodies are named only where a finding concerns them.
- The County Executive and the County Assembly are audited separately and are shown separately. For FY 2013/14 the first audit covered the whole county government over 16 months.
- Opinions are quoted as printed. Titles of findings are short neutral summaries; amounts are as printed, with the report’s own label, and are never added together.
Audit opinion by year
An unqualified opinion means the accounts give a fair view. A qualified opinion means they do, except for the matters listed. An adverse opinion means they do not. A disclaimer means the auditor could not obtain enough evidence to form an opinion.
| Fiscal year | County Executive | County Assembly |
|---|---|---|
| FY 2013/14, whole county government (16 months) | Disclaimer of Opinion · 8 findings recorded Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 6 | |
| FY 2013/14 | Financial operations review: no opinion printed · 11 findings recorded Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 6, confidence 3 | No report found The FY 2013/14 financial operations file is titled for the executive and assembly but holds the executive report only; the 16-month audit covers the county government as a whole. |
| FY 2014/15 | Adverse Senate County Public Accounts and Investments Committee, Annexes to Fiduciary Report (November 2018), PDF p. 4, confidence 3 Reused from data/history.json: Senate compilation, not the audit report; may cover executive and assembly together. No findings are recorded for this year. | No report found No County Assembly of Siaya audit report found in the Parliament library (searched 21 Nov 2026); oagkenya.go.ke returned HTTP 503. |
| FY 2015/16 | Qualified Senate County Public Accounts and Investments Committee, Annexes to Fiduciary Report (November 2018), PDF p. 2, confidence 3 Reused from data/history.json: Senate compilation, not the audit report. No findings are recorded for this year. | No report found No County Assembly of Siaya audit report found in the Parliament library (searched 21 Nov 2026); oagkenya.go.ke returned HTTP 503. |
| FY 2016/17 | Adverse Opinion Parliamentary Budget Office, County Fact Sheets 2024 (April 2025), PDF p. 392, confidence 2 Official compilation (secondary): Parliamentary Budget Office, County Fact Sheets 2024, Table 5 "Audit Opinions for Siaya County Executive and Assembly (FY 2013/14-2022/23)", County Executive row, printed "Adverse" (PDF p. 392; source line "Controller of Budget reports"). The Auditor-General's report for the year is not held, so the opinion is not confirmed against the audit itself and no findings are recorded. An opinion is the auditor's finding about the financial statements, not a verdict on any person. | Adverse Opinion Parliamentary Budget Office, County Fact Sheets 2024 (April 2025), PDF p. 392, confidence 2 Official compilation (secondary): Parliamentary Budget Office, County Fact Sheets 2024, Table 5 "Audit Opinions for Siaya County Executive and Assembly (FY 2013/14-2022/23)", County Assembly row, printed "Adverse" (PDF p. 392; source line "Controller of Budget reports"). The Auditor-General's report for the year is not held, so the opinion is not confirmed against the audit itself and no findings are recorded. An opinion is the auditor's finding about the financial statements, not a verdict on any person. |
| FY 2017/18 | Qualified Opinion Parliamentary Budget Office, County Fact Sheets 2024 (April 2025), PDF p. 392, confidence 2 Official compilation (secondary): Parliamentary Budget Office, County Fact Sheets 2024, Table 5 "Audit Opinions for Siaya County Executive and Assembly (FY 2013/14-2022/23)", County Executive row, printed "Qualified" (PDF p. 392; source line "Controller of Budget reports"). The Auditor-General's report for the year is not held, so the opinion is not confirmed against the audit itself and no findings are recorded. An opinion is the auditor's finding about the financial statements, not a verdict on any person. | Qualified Opinion Parliamentary Budget Office, County Fact Sheets 2024 (April 2025), PDF p. 392, confidence 2 Official compilation (secondary): Parliamentary Budget Office, County Fact Sheets 2024, Table 5 "Audit Opinions for Siaya County Executive and Assembly (FY 2013/14-2022/23)", County Assembly row, printed "Qualified" (PDF p. 392; source line "Controller of Budget reports"). The Auditor-General's report for the year is not held, so the opinion is not confirmed against the audit itself and no findings are recorded. An opinion is the auditor's finding about the financial statements, not a verdict on any person. |
| FY 2018/19 | Qualified Opinion Parliamentary Budget Office, County Fact Sheets 2024 (April 2025), PDF p. 392, confidence 2 Official compilation (secondary): Parliamentary Budget Office, County Fact Sheets 2024, Table 5 "Audit Opinions for Siaya County Executive and Assembly (FY 2013/14-2022/23)", County Executive row, printed "Qualified" (PDF p. 392; source line "Controller of Budget reports"). The Auditor-General's report for the year is not held, so the opinion is not confirmed against the audit itself and no findings are recorded. An opinion is the auditor's finding about the financial statements, not a verdict on any person. | Qualified Opinion Parliamentary Budget Office, County Fact Sheets 2024 (April 2025), PDF p. 392, confidence 2 Official compilation (secondary): Parliamentary Budget Office, County Fact Sheets 2024, Table 5 "Audit Opinions for Siaya County Executive and Assembly (FY 2013/14-2022/23)", County Assembly row, printed "Qualified" (PDF p. 392; source line "Controller of Budget reports"). The Auditor-General's report for the year is not held, so the opinion is not confirmed against the audit itself and no findings are recorded. An opinion is the auditor's finding about the financial statements, not a verdict on any person. |
| FY 2019/20 | Qualified Opinion · 13 findings recorded Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 518, confidence 3 | No report found No County Assembly of Siaya audit report found in the Parliament library (searched 21 Nov 2026); oagkenya.go.ke returned HTTP 503. |
| FY 2020/21 | Qualified Opinion · 32 findings recorded Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 33, confidence 4 | Qualified Opinion · 8 findings recorded Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 28, confidence 4 |
| FY 2021/22 | Adverse Opinion · 45 findings recorded Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, confidence 4 | No report found No County Assembly of Siaya audit report found in the Parliament library (searched 21 Nov 2026); oagkenya.go.ke returned HTTP 503. |
| FY 2022/23 | Qualified Opinion · 33 findings recorded Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 39, confidence 4 | Qualified Opinion · 12 findings recorded Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 51, confidence 4 |
| FY 2023/24 | Qualified Opinion · 34 findings recorded Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 44, confidence 4 | Qualified Opinion · 14 findings recorded Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 53, confidence 4 |
| FY 2024/25 | Qualified Opinion · 39 findings recorded Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 47, confidence 3 | Qualified Opinion · 13 findings recorded Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 53, confidence 3 |
Years with no audit report found
These gaps are listed, not filled. A gap means no report was found in the Parliament library on 21 Nov 2026, not that no audit took place.
- County Executive: none.
- County Assembly: FY 2013/14, FY 2014/15, FY 2015/16, FY 2019/20, FY 2021/22.
- Opinion only (County Executive, FY 2014/15; County Executive, FY 2015/16): Only a Senate compilation of opinions was found; no audit report, so no findings.
- Opinion only (County Executive, FY 2016/17): The Auditor-General's report is still not held (no County Executive of Siaya report for FY 2016/17 in the Parliament library; oagkenya.go.ke serves a bot check, 27 Nov 2026). The opinion comes from the Parliamentary Budget Office's County Fact Sheets 2024 (official compilation, secondary), so no findings are recorded.
- Opinion only (County Executive, FY 2017/18): The Auditor-General's report is still not held (no County Executive of Siaya report for FY 2017/18 in the Parliament library; oagkenya.go.ke serves a bot check, 27 Nov 2026). The opinion comes from the Parliamentary Budget Office's County Fact Sheets 2024 (official compilation, secondary), so no findings are recorded.
- Opinion only (County Executive, FY 2018/19): The Auditor-General's report is still not held (no County Executive of Siaya report for FY 2018/19 in the Parliament library; oagkenya.go.ke serves a bot check, 27 Nov 2026). The opinion comes from the Parliamentary Budget Office's County Fact Sheets 2024 (official compilation, secondary), so no findings are recorded.
- Opinion only (County Assembly, FY 2016/17): The Auditor-General's report is still not held (no County Assembly of Siaya report for FY 2016/17 in the Parliament library; oagkenya.go.ke serves a bot check, 27 Nov 2026). The opinion comes from the Parliamentary Budget Office's County Fact Sheets 2024 (official compilation, secondary), so no findings are recorded.
- Opinion only (County Assembly, FY 2017/18): The Auditor-General's report is still not held (no County Assembly of Siaya report for FY 2017/18 in the Parliament library; oagkenya.go.ke serves a bot check, 27 Nov 2026). The opinion comes from the Parliamentary Budget Office's County Fact Sheets 2024 (official compilation, secondary), so no findings are recorded.
- Opinion only (County Assembly, FY 2018/19): The Auditor-General's report is still not held (no County Assembly of Siaya report for FY 2018/19 in the Parliament library; oagkenya.go.ke serves a bot check, 27 Nov 2026). The opinion comes from the Parliamentary Budget Office's County Fact Sheets 2024 (official compilation, secondary), so no findings are recorded.
Findings by year, entity and category
Number of findings by category: all entities, all years with a report
View as table
| Period | Findings (findings) |
|---|---|
| Payroll and staff | 52 |
| Projects and contracts | 38 |
| Spending not fully supported | 26 |
| Assets | 22 |
| Financial statements | 20 |
| Procurement | 15 |
| Budget control | 13 |
| Pending bills | 12 |
| Transfers and funds | 12 |
| Governance | 10 |
| Imprest | 9 |
| Cash and bank | 7 |
| Revenue | 5 |
| ICT systems | 5 |
| Other | 16 |
A count shows how the auditor divided the report into paragraphs. A higher count is not by itself a worse year, and counts are not evidence that a given finding recurred.
The findings
Showing 262 of 262 findings
Statements omit assets and liabilities inherited from the defunct local authorities
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 4, paragraph 1.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 4, paragraph 1.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- None printed
Revenue figure could not be confirmed (next-year receipt included; devolved-function revenue left out)
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 4, paragraph 2.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 4, paragraph 2.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- revenue figure not confirmed: KSh 4,024,406,380
Compensation of employees differs from payroll and National Treasury records
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 3.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 3.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- unexplained difference: KSh 44,071,973
No supporting schedules for goods and services
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 4.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 4.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- expenditure not confirmed: KSh 645,134,054
Scholarship and education grants not broken down
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 5.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 5.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- grants not confirmed: KSh 31,554,000
No fixed assets register or breakdown for asset purchases
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 6.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 5, paragraph 6.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- acquisition of assets not confirmed: KSh 495,330,325
Budget and contingency reserves recorded as spending without support
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 6, paragraph 7.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 6, paragraph 7.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- other payments not confirmed: KSh 14,422,187
Imprests not surrendered by year end
Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 6, paragraph 8.0
Section, amounts and follow-up
- Report
- Report of the Auditor General on the Financial Statements of County Government of Siaya for the sixteen (16) months Period Ended 30 June 2014, PDF p. 6, paragraph 8.0
- Section
- Basis for disclaimer of opinion
- Amounts as printed
- outstanding imprests: KSh 71,249,797
Cash shortages found at two county hospital cash offices
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 8, paragraph 1.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 8, paragraph 1.1
- Section
- Financial operations review
- Amounts as printed
- shortage, Siaya County Referral Hospital: KSh 11,971,312; shortage, Bondo Sub-County Hospital: KSh 711,699
Three IFMIS/G-Pay payments to firms were recalled; part was not recovered
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 9, paragraph 1.4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 9, paragraph 1.4
- Section
- Financial operations review (the report’s own heading: “Fraudulent Transactions Through IFMIS/G-Pay Account”)
- Amounts as printed
- three payments: KSh 84,591,775; not recovered: KSh 4,237,471
ECD classroom contracts let without tender adverts or evaluation committees
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 9, paragraph 2.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 9, paragraph 2.1
- Section
- Financial operations review
- Amounts as printed
- cost of ECD classrooms project: KSh 167,878,693; retention held without a separate bank account: KSh 9,980,231
Solar street-lighting masts paid in full without inspection and acceptance
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 10, paragraph 2.6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 10, paragraph 2.6
- Section
- Financial operations review
- Amounts as printed
- paid: KSh 13,431,744
Vehicles and ambulances bought above budget without a supplementary budget
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 10, paragraph 2.7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 10, paragraph 2.7
- Section
- Financial operations review
- Amounts as printed
- over-expenditure: KSh 69,451,030
Unsold subsidised seed spoiled in storage
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 12, paragraph 3.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 12, paragraph 3.2
- Section
- Financial operations review
- Amounts as printed
- loss on unsold seed: KSh 6,392,595
Payment vouchers missing for refurbishment and furniture spending
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 12, paragraph 3.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 12, paragraph 3.3
- Section
- Financial operations review
- Amounts as printed
- vouchers not produced: KSh 8,158,143
Travel and subsistence spending without journey evidence
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 13, paragraph 3.5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 13, paragraph 3.5
- Section
- Financial operations review
- Amounts as printed
- Executive, not supported: KSh 12,807,076
Firm paid to prepare defunct local authorities' accounts without explained selection
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 14, paragraph 3.9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 14, paragraph 3.9
- Section
- Financial operations review
- Amounts as printed
- paid: KSh 4,150,000
Contributions paid to the Council of Governors
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 16, paragraph 3.13
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 16, paragraph 3.13
- Section
- Financial operations review
- Amounts as printed
- paid: KSh 7,500,890
Tractor-hire revenue not reconciled with spending on the scheme
Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 17, paragraph 4.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on the Financial Operations of Siaya County Executive and Assembly for the Period 1st July 2013 to 30 June 2014, PDF p. 17, paragraph 4.2
- Section
- Financial operations review
- Amounts as printed
- allocation for the scheme: KSh 13,000,000
- Note
- The spending figure is not legible in the text layer, so only the allocation is recorded.
Unexplained negative adjustment to budgeted exchequer releases
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 518, paragraph 1.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 518, paragraph 1.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- adjustment: KSh 341,576,215
Fixed asset additions and balances do not reconcile
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 520, paragraph 2.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 520, paragraph 2.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- unreconciled additions: KSh 181,547,678; unexplained comparative difference: KSh 3,769,527,365
Compensation of employees differs from supporting schedule
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 523, paragraph 3.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 523, paragraph 3.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 36,495,000
Transfers to other government units differ from schedules
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 523, paragraph 4.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 523, paragraph 4.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 223,979,049
Pending bills balance could not be confirmed
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 524, paragraph 5.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 524, paragraph 5.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- pending bills at 30 June 2020: KSh 222,333,808
Budgetary control and performance
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 526, paragraph 1.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 526, paragraph 1.0
- Section
- Other matter
- Amounts as printed
- None printed
Late exchequer releases
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 526, paragraph 2.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 526, paragraph 2.0
- Section
- Other matter
- Amounts as printed
- None printed
Payment to the Council of Governors
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 527, paragraph 1.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 527, paragraph 1.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 1,250,000
Imprests issued in 2018/19 not surrendered
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 528, paragraph 2.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 528, paragraph 2.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- not surrendered: KSh 7,035,768
- Earlier year
- The report says this dates from an earlier year: Imprests issued in FY 2018/19 were still not surrendered at 30 June 2020
Regional diversity requirement in staffing not met
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 530, paragraph 4.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 530, paragraph 4.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
37 employees with net pay below one-third of basic pay
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 532, paragraph 5.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 532, paragraph 5.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Compensation of employees at 38% of revenue
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 532, paragraph 6.0
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 532, paragraph 6.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- compensation of employees: KSh 2,326,451,400
Tractors bought in 2014 lying idle (14 of 22)
Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 533, paragraph 7.1
Section, amounts and follow-up
- Report
- Reports of the Auditor General on the Financial Statements of Tharaka Nithi, Homa Bay, Kakamega, Kirinyaga, Makueni, Meru, Bomet, Murang'a, Nandi, Nyamira, Nyeri, Siaya, Vihiga, Wajir and Samburu 2019-2020, PDF p. 533, paragraph 7.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- cost of tractors: KSh 15,383,574
Bank reconciliations differ from bank certificates
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 34, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 34, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- cash and cash equivalents not confirmed: KSh 955,384,150
Prior-year error corrected without restating comparatives
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 2,286,976
Retention monies not backed by bank balance
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- unexplained shortfall: KSh 9,939,747
Transfers to the emergency fund and youth polytechnics not accounted for
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- other grants and transfers not confirmed: KSh 538,130,277
Intangible asset purchase not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 35, paragraph 5
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 4,594,990
Training payments without supporting documents
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 6.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 6.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 135,349,979
Hospitality payments without supporting documents
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 6.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 6.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 48,180,638
Office and general supplies payments without details of goods
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 6.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 6.3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 46,847,895; total of paragraphs 6.1 to 6.3 not confirmed: KSh 230,378,512
Revenue shortfall against budget; transfers with no budget provision
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 36, paragraph 1
- Section
- Other matter
- Amounts as printed
- underfunding (17%): KSh 1,424,058,911; spent without budget provision: KSh 538,130,277
Late exchequer releases (33% in the fourth quarter)
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 37, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 37, paragraph 2
- Section
- Other matter
- Amounts as printed
- released in the fourth quarter: KSh 1,940,303,250
Pending bills carried forward, some outstanding since 2014
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 37, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 37, paragraph 3
- Section
- Other matter
- Amounts as printed
- pending bills: KSh 601,738,508
- Earlier year
- The report says this dates from an earlier year: Report states some bills have been outstanding since 2014
Haudinga sheltered workshop incomplete a year after due date
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 38, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 38, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 5,407,305
Nyasanda sheltered workshop works not done
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 38, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 38, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 1,500,000
Nyamnina youth polytechnic incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 38, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 38, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 2,908,328
Odera Akang'o campus renovation incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 39, paragraph 4.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 39, paragraph 4.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid in the year: KSh 5,067,399; certified to date: KSh 33,955,486
Generator delivered in 2018 not commissioned
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 39, paragraph 4.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 39, paragraph 4.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 1,678,003
Obaga West Asembo health centre laboratory variation not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 39, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 39, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 1,295,372
Road maintenance paid with no evidence of works
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 40, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 40, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 10,305,315
Siaya slaughterhouse rehabilitation incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 40, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 40, paragraph 7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 3,999,999
Migwena sports stadium contract terminated; award for works paid
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 40, paragraph 8
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 40, paragraph 8
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid under the award: KSh 6,966,833
Siaya County Stadium incomplete 23 months after completion date
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 41, paragraph 9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 41, paragraph 9
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid to main contractor in the year: KSh 80,254,180; contract sum: KSh 394,661,767
X-ray machine at Madiany Sub-County Hospital not commissioned
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 41, paragraph 10
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 41, paragraph 10
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid in the year: KSh 2,500,000; amount the report says may not give value for money: KSh 4,500,000
- Note
- The report gives a contract sum of KSh 4,150,000 and a paid amount of KSh 2,500,000 but concludes on KSh 4,500,000; all are as printed.
Vocational training centres understaffed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 11
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 11
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- grants disbursed to 18 centres: KSh 24,097,920
Imprests not surrendered; second imprests issued
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 12
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 12
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- still outstanding at audit: KSh 13,923,575; second imprests issued: KSh 9,620,975
159 employees with net pay below one-third of basic pay
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 13
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 13
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
78 employees past retirement age on the payroll
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 14
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 42, paragraph 14
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Payment to the Lake Region Economic Bloc without legal basis
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 43, paragraph 15
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 43, paragraph 15
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 2,000,000
No approved risk management policy; no IT security or recovery plans
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 43, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 43, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Eight staff acting for more than six months
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 2
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Valuation roll not started
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 3
- Section
- Internal controls, risk management and governance
- Amounts as printed
- estimated cost in procurement plan: KSh 4,018,481
No policy on recruitment of casual workers
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 4
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Payments to 20 employees outside the payroll system
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2021, PDF p. 44, paragraph 5
- Section
- Internal controls, risk management and governance
- Amounts as printed
- paid outside IPPD: KSh 5,642,979
Temporary staff wages rose without approval or needs assessment
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, paragraph 1.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, paragraph 1.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- without needs assessment: KSh 23,167,050; temporary wages: KSh 360,506,813
Other personnel payments not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, paragraph 1.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, paragraph 1.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not confirmed: KSh 308,302,691
Basic salaries differ from the payroll system
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, paragraph 1.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 45, paragraph 1.3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 24,404,826
Domestic travel paid to county accounts instead of payees
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid to the County Government: KSh 111,976,000; paid to the Emergency Fund account: KSh 3,200,000; air travel not supported: KSh 4,674,800
Foreign travel not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 2,605,396
Training paid through imprest not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 12,341,576
Hospitality paid through imprest not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 53,581,947
Specialised materials: ledger variance and missing vouchers
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 46, paragraph 2.5
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 6,416,438; vouchers not provided: KSh 40,144,243; imprest payments without documents: KSh 350,000,000
Operating expenses paid through imprest not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.6
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid through imprest: KSh 46,500,000; not supported: KSh 18,696,392
Rent payments for office space queried
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.7
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- rentals of produced assets (total): KSh 7,570,564
Vehicle maintenance payments not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.8
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.8
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 7,646,627
Legal fees without fee notes or competitive selection
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 47, paragraph 2.9
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- legal fees: KSh 9,766,800
Asset purchases without payment vouchers
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 3.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 3.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 72,315,850
Studies and land purchase amounts differ from IFMIS and sector records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 3.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 3.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 23,075,750
Bank balances: stale cheques and bursary fund variance
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- unreconciled variance: KSh 1,294,402
Pending bills differ from supporting schedules
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 5.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 48, paragraph 5.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 80,047,749; pending bills not confirmed: KSh 818,803,232
Pending bills taskforce figure not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 49, paragraph 5.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 49, paragraph 5.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- taskforce figure: KSh 1,036,248,598
Underfunding and spending without budget provision
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 49, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 49, paragraph 1
- Section
- Other matter
- Amounts as printed
- underfunding (12%): KSh 1,085,355,017; without budget provision: KSh 420,084,756
Prior-year matters unresolved
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 49, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 49, paragraph 2
- Section
- Other matter
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report states issues from the previous year remain unresolved
Imprest transfers expensed on issue
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 50, paragraph 1.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 50, paragraph 1.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- transferred and expensed: KSh 1,075,025,345
Imprests surrendered late or outstanding over a year
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 50, paragraph 1.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 50, paragraph 1.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- outstanding for more than a year: KSh 661,840
- Earlier year
- The report says this dates from an earlier year: Report states some imprests were outstanding for more than a year
14 employees past retirement age on the payroll
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 50, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 50, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
119 officers with net pay below one-third of basic pay
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- net salaries: KSh 1,508,608
Recruitment without approved establishment or plan
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
ERP system still in development 14 months after contract
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 21,600,000; contract sum: KSh 72,420,000
Siaya County Stadium: six extensions, variation and expired performance bond
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 51, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid in the year: KSh 57,999,787
Construction contracts concentrated among few contractors
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 52, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 52, paragraph 7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid to three contractors: KSh 500,892,638; roads sector, two contractors: KSh 327,000,412
Road contracts concentrated: 57% of spending to 11 contractors
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 52, paragraph 8.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 52, paragraph 8.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid to 11 contractors: KSh 605,289,909
Kwaweya-Yenga-Nyalula-Udura-Kolum road: 3 km not graded or gravelled
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 53, paragraph 8.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 53, paragraph 8.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 7,722,584
Damaged culvert on Boro-Katondi road after repairs
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 53, paragraph 8.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 53, paragraph 8.3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum, three roads: KSh 14,659,268
- Note
- The paid amount is partly illegible in the text layer, so the contract sum is recorded.
Siaya Bus Park incomplete; extension not evaluated
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 53, paragraph 8.4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 53, paragraph 8.4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 23,014,867
Five ECD classrooms incomplete, including Kirindo Primary
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 9
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- total contract sum: KSh 19,124,181
- Note
- The paid amount is illegible in the text layer, so the contract sum is recorded.
Nine boreholes not equipped
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 10
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 10
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 29,040,488
- Note
- The paid amount is illegible in the text layer, so the contract sum is recorded.
Madiany ginnery power house not operational
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 11
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 11
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 10,237,191
Kagwa laboratory completed but not used
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 12
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 54, paragraph 12
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- cost: KSh 4,326,869
Transformer at Ambira Sub-County Hospital not installed; X-ray unused
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 55, paragraph 13
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 55, paragraph 13
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 2,324,054
Commitments made after 31 May included in pending bills
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 55, paragraph 14
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 55, paragraph 14
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- late commitments: KSh 77,122,956
Purchases made outside the e-procurement system
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 55, paragraph 15
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 55, paragraph 15
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- spent: KSh 6,276,158
Businesses not mapped for permit monitoring
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Own-source revenue collection not automated
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 2
- Section
- Internal controls, risk management and governance
- Amounts as printed
- own-source revenue: KSh 446,379,627
No casual recruitment policy; 5,679 casual workers
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 3
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
23 disciplinary cases not determined, some since 2014
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 4
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report states some cases date back to 2014
Emergency non-pharmaceutical supplies without tender opening or store records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 56, paragraph 5
- Section
- Internal controls, risk management and governance
- Amounts as printed
- supplies: KSh 26,290,000
Non-current assets not insured
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 57, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 57, paragraph 6
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
No risk management policy
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 57, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2022, PDF p. 57, paragraph 7
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Salary arrears paid more than once to 562 employees without justification
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 40, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 40, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- arrears: KSh 77,924,317
Domestic travel differs from the ledger
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 40, paragraph 2.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 40, paragraph 2.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 10,566,926
Training vote paid Assembly members' hotel budget-review meeting
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 41, paragraph 2.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 41, paragraph 2.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 7,903,000
Insurance paid above the contracted premium
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 42, paragraph 2.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 42, paragraph 2.3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid above premium: KSh 22,389,287
Specialised materials differ from supporting documents
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 42, paragraph 2.4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 42, paragraph 2.4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 6,047,739
Other operating expenses differ from records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 42, paragraph 2.5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 42, paragraph 2.5
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 609,420
1,103 IFMIS transactions voided without Controller of Budget approval
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 43, paragraph 2.6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 43, paragraph 2.6
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- voided: KSh 874,756,305
Emergency fund transfers differ across records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 43, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 43, paragraph 3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- per Note 7: KSh 70,000,000; per records: KSh 22,328,126; per Emergency Fund records: KSh 73,200,000
Asset acquisition differs from the ledger
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 43, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 43, paragraph 4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance, civil works: KSh 5,600,224; variance, other: KSh 760,261
Retention and deposits block figure unsupported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 44, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 44, paragraph 5
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- unsupported: KSh 1,097,272
- Earlier year
- The report says this dates from an earlier year: Report states the same balance appeared in the prior year
Pending bills differ from schedules; part overdue beyond 60 days
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 44, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 44, paragraph 1
- Section
- Emphasis of matter
- Amounts as printed
- pending bills: KSh 741,559,698; variance: KSh 24,551,196; overdue more than 60 days: KSh 421,007,070
Pending staff payables opening balance differs from the prior audit
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 45, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 45, paragraph 2
- Section
- Emphasis of matter
- Amounts as printed
- variance: KSh 126,257,213
Underfunding of 12% of the budget
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 45, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 45, paragraph 3
- Section
- Emphasis of matter
- Amounts as printed
- underfunding: KSh 894,682,192
Prior-year matters unresolved
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 45, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 45, paragraph 1
- Section
- Other matter
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report states issues from the previous year remain unresolved
Wage bill at 42% of revenue, above the 35% ceiling
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 46, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 46, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- compensation of employees: KSh 2,666,925,706
Kirindo Primary ECD block stalled
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 46, paragraph 2.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 46, paragraph 2.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 2,570,332
Siaya Bus Park contract terminated at the contractor's request
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 46, paragraph 2.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 46, paragraph 2.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 17,582,978
Ukwala modern market incomplete; contractor left site
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 47, paragraph 2.3.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 47, paragraph 2.3.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 4,252,545
Nyadorera modern market incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 47, paragraph 2.3.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 47, paragraph 2.3.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 8,532,406
Akala and Ramba market fencing and gravelling queried
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 47, paragraph 2.3.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 47, paragraph 2.3.3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 7,715,774
Aila borehole contract relocated; no drilling at the site
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 48, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 48, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 4,479,975
Siaya County Stadium cost revised up 24% without evaluation
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 48, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 48, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- variation: KSh 94,055,056; original contract sum: KSh 394,661,767
ERP system paid in part but not complete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 28,000,000; contract sum: KSh 72,420,000
Land bought for a research centre not fenced or beaconed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- cost: KSh 32,900,005
28 employees re-designated outside job-group rules
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Tax arrears to KRA outstanding over two years
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 8
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 49, paragraph 8
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- owed: KSh 142,262,146
- Earlier year
- The report says this dates from an earlier year: Report states the obligation had been outstanding for over two years
118 employees paid without observing the one-third rule
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 50, paragraph 9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 50, paragraph 9
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
87% of staff from one community, above the one-third limit
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 50, paragraph 10
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 50, paragraph 10
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Farm inputs distributed without store records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 51, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 51, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- cost of inputs: KSh 113,402,681
ICT asset register incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 51, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 51, paragraph 2
- Section
- Internal controls, risk management and governance
- Amounts as printed
- items bought in the year: KSh 9,280,798
Imprests outstanding over 300 days; imprests issued on the last day of the year
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 51, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 51, paragraph 3
- Section
- Internal controls, risk management and governance
- Amounts as printed
- outstanding over 300 days: KSh 47,838,660; issued on 30 June 2023: KSh 9,218,750
No audit committee
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 52, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 52, paragraph 4
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Court awards unpaid
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 52, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2023., PDF p. 52, paragraph 5
- Section
- Internal controls, risk management and governance
- Amounts as printed
- unpaid: KSh 32,219,224
Salaries paid outside the payroll system to 240 staff
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 45, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 45, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid outside IPPD: KSh 14,509,755; compensation of employees: KSh 2,872,515,819
19 staff each paid over KSh 2m in travel allowances
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 51,744,232
- Next report
- Listed as unresolved in the following year’s report
- Note
- Leading digit read as 5 from "S1,744,232" in the text layer.
Transport companies hired without clear selection
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 70,751,623
- Next report
- Listed as unresolved in the following year’s report
Travel allowance paid to the county government account
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 3,360,000
- Next report
- Listed as unresolved in the following year’s report
Executive paid Assembly members' sitting allowances
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 46, paragraph 2.1.4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 2,903,600
- Next report
- Listed as unresolved in the following year’s report
Training without needs assessments
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 47, paragraph 2.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 47, paragraph 2.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- training expenses: KSh 14,596,631
- Next report
- Listed as unresolved in the following year’s report
Legal fees and an out-of-court settlement not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 47, paragraph 2.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 47, paragraph 2.3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- legal fees: KSh 34,662,766; settlement: KSh 26,000,000
- Next report
- Listed as unresolved in the following year’s report
Transfers differ from IFMIS records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 48, paragraph 3.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 48, paragraph 3.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- largest difference (aggregation and industrial park): KSh 108,017,085
- Next report
- Listed as unresolved in the following year’s report
Payments to companies recorded as transfers
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 48, paragraph 3.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 48, paragraph 3.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid to third parties: KSh 178,246,942
Bank reconciliations include July 2024 receipts
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 48, paragraph 4.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 48, paragraph 4.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- recurrent account: KSh 392,025,630; development account: KSh 230,096,435
- Next report
- Listed as unresolved in the following year’s report
Land parcels bought without supporting documents
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 49, paragraph 5.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 49, paragraph 5.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- nine parcels: KSh 32,970,000
- Next report
- Listed as unresolved in the following year’s report
Exchequer receipts of 2 to 5 July 2024 counted in the year
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 49, paragraph 6.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 49, paragraph 6.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- outside cut-off: KSh 710,018,028
- Next report
- Listed as unresolved in the following year’s report
1,500 IFMIS transactions voided without explanation
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 49, paragraph 7.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 49, paragraph 7.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- voided: KSh 560,626,783
- Next report
- Listed as unresolved in the following year’s report
Underfunding of 18% of the budget
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 50, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 50, paragraph 1
- Section
- Emphasis of matter
- Amounts as printed
- underfunding: KSh 1,526,848,377
- Next report
- Listed as unresolved in the following year’s report
Pending bills unsettled beyond 60 days
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 50, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 50, paragraph 2
- Section
- Emphasis of matter
- Amounts as printed
- pending bills (over): KSh 1,186,014,495
- Next report
- Listed as unresolved in the following year’s report
Prior-year matters unresolved
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 50, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 50, paragraph 1
- Section
- Other matter
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report states issues from the previous year remain unresolved
Rent for official residences; residences not built
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 51, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 51, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- rent: KSh 3,600,000
- Next report
- Listed as unresolved in the following year’s report
Staff medical insurance premium paid at 52%
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 51, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 51, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 105,040,484; contract premium: KSh 201,970,162
- Next report
- Listed as unresolved in the following year’s report
245 employees with net pay below one-third of basic pay
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
89% of permanent staff from one community
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Imprests not surrendered; nine staff given second imprests
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- issued in the year, not surrendered: KSh 5,307,721; from 2022/23: KSh 520,050; second imprests: KSh 1,297,900
- Earlier year
- The report says this dates from an earlier year: Report states KSh 520,050 relates to FY 2022/23
- Next report
- Listed as unresolved in the following year’s report
22 of 23 oversight committee recommendations not implemented
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 52, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Recommendations were on the FY 2021/22 audit report
- Next report
- Listed as unresolved in the following year’s report
County buildings not insured
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 53, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 53, paragraph 7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Payments to the Council of Governors and the Lake Region Economic Bloc
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 53, paragraph 8
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 53, paragraph 8
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- Council of Governors: KSh 3,000,000; Lake Region Economic Bloc: KSh 1,500,000
- Next report
- Listed as unresolved in the following year’s report
Stadium power connection paid but not installed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 53, paragraph 9.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 53, paragraph 9.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 1,336,721
- Next report
- Listed as unresolved in the following year’s report
Stadium seats: advance paid without inspection; fewer seats installed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 9.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 9.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- advance: KSh 5,020,222; contract sum: KSh 25,101,114
- Next report
- Listed as unresolved in the following year’s report
Migwena perimeter wall delayed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 9.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 9.3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 33,841,097
- Next report
- Listed as unresolved in the following year’s report
Migwena washroom and electrification works delayed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 9.4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 9.4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 4,350,440; contract sum: KSh 18,630,456
- Next report
- Listed as unresolved in the following year’s report
Siaya County Stadium: 24% cost increase and nine extensions
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 9.5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 9.5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- variation: KSh 94,055,056; revised contract sum: KSh 488,716,823
- Next report
- Listed as unresolved in the following year’s report
Aggregation and industrial park works behind schedule
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 9.6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 9.6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 483,688,922.23
- Next report
- Listed as unresolved in the following year’s report
Yala cattle ring incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 9.7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 9.7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 4,500,962.55
- Next report
- Listed as unresolved in the following year’s report
Akala health centre toilets and bathrooms incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 9.8
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 9.8
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 3,215,578.8; paid: KSh 1,000,000
- Next report
- Listed as unresolved in the following year’s report
X-ray machine at Got Agulu Hospital idle for lack of a radiographer
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 9.9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 9.9
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- spent: KSh 14,760,000
- Next report
- Listed as unresolved in the following year’s report
No risk assessment report
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Employee costs differ from payroll summaries
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 48, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 48, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- unreconciled variance: KSh 420,325,972
Salary arrears not reconciled
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 48, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 48, paragraph 2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- arrears paid: KSh 99,694,941
Payment to an insurance broker not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 30,000,000
Executive paid Assembly members' meeting allowances
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- paid: KSh 1,713,600
Security and cleaning payables not supported
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 5
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- unsupported: KSh 14,925,862; trade and other payables: KSh 1,889,967,165.44
Transitional IPSAS reporting template not followed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 49, paragraph 6
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- None printed
Transfers from the County Revenue Fund differ
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 50, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 50, paragraph 7
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 24,377,123.11
Underfunding of 22% of the budget
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 50, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 50, paragraph 1
- Section
- Emphasis of matter
- Amounts as printed
- underfunding: KSh 2,143,204,703
Payables brought forward, some ten years old
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 50, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 50, paragraph 2
- Section
- Emphasis of matter
- Amounts as printed
- brought forward: KSh 184,615,904
- Earlier year
- The report says this dates from an earlier year: Report states some payables date back ten years
Climate change fund grant not received
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 51, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 51, paragraph 1
- Section
- Other matter
- Amounts as printed
- budget estimate: KSh 137,000,000
30 prior-year matters unresolved (Appendix 1)
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 51, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 51, paragraph 2
- Section
- Other matter
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report lists 30 FY 2023/24 matters as unresolved (PDF p. 63-65)
Climate change regulations not operationalised
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 52, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 52, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- Climate Change Fund: KSh 132,573,505
Persons with disabilities 0.56% of staff
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 52, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 52, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Offices lack disability access
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Staffing does not meet the National Cohesion and Integration Act
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
30% procurement reservation not met
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
No value-for-money assessment of a framework contract
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 53, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 20,536,439
Aggregation and industrial park construction
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 483,688,922
Maranyona ECD block incomplete
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 8
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 8
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 4,134,669
ECD tender variation not evaluated (Nyandheho)
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 9
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 9
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- variation: KSh 265,542
Nyabera ECD block stalled
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 10
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 10
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 4,307,957
Theatre equipment at Siaya hospital not installed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 11
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 11
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- cost: KSh 22,974,650
Completed facilities idle (including Malunga maternity block)
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 56, paragraph 12
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 56, paragraph 12
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- Malunga contract: KSh 4,400,000
House allowances paid above grade entitlement
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 56, paragraph 13
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 56, paragraph 13
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- overpaid: KSh 22,331,251
Staff above the approved establishment in Job Groups A and B
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 14
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 14
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
No human resource plans or policies
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 15
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 15
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
449 employees without personal numbers
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 16
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 16
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
608 appointments without recruitment records
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 17
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 17
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Appointment and posting letters not provided
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 18
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 18
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Modern ECDE centre in Bondo: advance payment queried
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 19
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 19
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- advance (20%): KSh 10,931,825
Bondo mortuary cold room delayed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 59, paragraph 20
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 59, paragraph 20
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- contract sum: KSh 54,685,880
Imprests not surrendered
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 59, paragraph 21
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 59, paragraph 21
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- outstanding: KSh 4,551,674
Wage bill at 43% of receipts
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 59, paragraph 22
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 59, paragraph 22
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- employee costs: KSh 2,975,810,506.58
Liabilities at 27% of revenue, above the 20% limit
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 60, paragraph 23
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 60, paragraph 23
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- total liabilities: KSh 1,891,436,239.44
2,323 IFMIS transactions voided
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 60, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 60, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- voided: KSh 4,081,328,220
Weaknesses in the legal department
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 60, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 60, paragraph 2
- Section
- Internal controls, risk management and governance
- Amounts as printed
- legal fees: KSh 25,505,473
Internal audit understaffed
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 61, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 61, paragraph 3
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
No IT strategic plan or steering committee
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 61, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 61, paragraph 4
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Staff member paid as both casual and permanent
Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 62, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Executive of Siaya for the Year Ended 30 June 2025, PDF p. 62, paragraph 5
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
Cash-flow adjustments not supported
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 29, paragraph 1.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 29, paragraph 1.1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- adjustments: KSh 14,809,796
Opening balances differ from prior audited balances
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 29, paragraph 1.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 29, paragraph 1.2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 83,496
Committee meetings held outside the county
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 30, paragraph 2.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 30, paragraph 2.0
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- hotel and subsistence: KSh 5,811,600
Underfunding of 32% of the budget
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 30, paragraph 1.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 30, paragraph 1.0
- Section
- Other matter
- Amounts as printed
- underfunding: KSh 249,727,050
Second imprests issued before earlier ones were accounted for
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- multiple imprests: KSh 98,517,964
88% of staff from one community
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Penalties for late tax remittance; pension fund interest claim
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- interest and penalties: KSh 249,866; interest claimed by LAPFUND: KSh 3,242,630
- Earlier year
- The report says this dates from an earlier year: Report states the pension interest accrued over several years
Payment to the County Assemblies Forum
Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly Of Siaya for the Year Ended 30 June 2021, PDF p. 31, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 5,000,000
Ward office operations charged to compensation of employees
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 52, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 52, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- misclassified: KSh 6,318,000
Subsistence allowance not supported
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 52, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 52, paragraph 2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- not supported: KSh 770,500
Training accommodation allowances without evidence of training
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 53, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 53, paragraph 3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- accommodation allowances: KSh 60,209,610; training not confirmed: KSh 66,525,460
Fixed assets register incomplete; additions not tagged
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 53, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 53, paragraph 4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- fixed assets: KSh 879,710,278
Underfunding of 21% of the budget
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 53, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 53, paragraph 1
- Section
- Emphasis of matter
- Amounts as printed
- underfunding: KSh 278,415,976
Ward boreholes and water kiosks contract incomplete
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 54, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 54, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- paid: KSh 64,836,353; contract sum: KSh 117,133,552
87% of staff from one community
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 54, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 54, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
County Assembly Fund not established
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 54, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 54, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Late remittance of statutory deductions
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 55, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 55, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Eight employees with net pay below one-third of basic pay
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 55, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 55, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
No data backup system
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 55, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 55, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Ward office salaries paid outside the payroll system
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 56, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2023, PDF p. 56, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- paid manually: KSh 16,274,350
Ward office operations charged to compensation of employees
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- misclassified: KSh 6,528,600
- Next report
- Listed as unresolved in the following year’s report
Legal services without procurement records
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 54, paragraph 2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- legal fees: KSh 9,270,180
- Next report
- Listed as unresolved in the following year’s report
Underfunding of 12% of the budget
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 1
- Section
- Emphasis of matter
- Amounts as printed
- underfunding: KSh 140,106,553
- Next report
- Listed as unresolved in the following year’s report
Prior-year matters unresolved
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 55, paragraph 1
- Section
- Other matter
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report states issues from the previous year remain unresolved
Fuel framework contract with four suppliers instead of seven
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 1.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 1.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Ward meeting halls, boreholes and water kiosks stalled
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 1.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 56, paragraph 1.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
94% of staff from one community
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 2.1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 2.1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Officers with net pay below one-third of basic pay
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 2.2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 2.2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Officer acting for more than six months
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 2.3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 2.3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Pending bills outstanding beyond 60 days
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 3.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 3.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- pending bills: KSh 15,205,456
- Next report
- Listed as unresolved in the following year’s report
County Assembly Fund not established
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 4.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 57, paragraph 4.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Late remittance of statutory deductions
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 58, paragraph 5.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 58, paragraph 5.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- PAYE: KSh 4,736,772; NSSF: KSh 79,720; NHIF: KSh 284,350
- Next report
- Listed as unresolved in the following year’s report
ICT steering committee met twice; projects without its recommendation
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 58, paragraph 6.0
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 58, paragraph 6.0
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- ICT projects: KSh 130,649,517
- Next report
- Listed as unresolved in the following year’s report
Internal audit issued one report in the year
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 59, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June, 2024, PDF p. 59, paragraph 1
- Section
- Internal controls, risk management and governance
- Amounts as printed
- None printed
- Next report
- Listed as unresolved in the following year’s report
Ward office operations charged to compensation of employees
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 1
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- misclassified: KSh 8,845,200
Property and equipment not depreciated; ward hall land without ownership documents
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 2
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- property, plant and equipment: KSh 144,656,958; East Yimbo ward hall: KSh 7,197,092; South Uyoma ward hall: KSh 7,589,949
Transitional IPSAS reporting template not followed
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 54, paragraph 3
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- None printed
Transfers from the County Revenue Fund differ
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 4
- Section
- Basis for opinion (financial statements)
- Amounts as printed
- variance: KSh 23,734,012.24
Underfunding of 10% of the budget
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 1
- Section
- Emphasis of matter
- Amounts as printed
- underfunding: KSh 99,668,295
13 prior-year matters unresolved
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 55, paragraph 1
- Section
- Other matter
- Amounts as printed
- None printed
- Earlier year
- The report says this dates from an earlier year: Report lists 13 FY 2023/24 matters as unresolved (PDF p. 56)
93.3% of staff from one community
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 1
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 1
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Officers with net pay below one-third of basic pay
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 2
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 2
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Persons with disabilities 1.49% of staff
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 3
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 3
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Training needs assessment not done every two years
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 4
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 4
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Procurement capacity building levy not deducted
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 5
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 57, paragraph 5
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Stores not kept or reported as required
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 6
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 6
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
No vehicle and equipment maintenance register
Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 7
Section, amounts and follow-up
- Report
- Report of the Auditor-General on County Assembly of Siaya for the Year Ended 30 June 2025, PDF p. 58, paragraph 7
- Section
- Lawfulness and effectiveness in use of public resources
- Amounts as printed
- None printed
Findings by category and year
The number of findings in each category, by year, as recorded from each report. Blank means none recorded in that category.
County Executive
| Category | FY 2013/14 | FY 2019/20 | FY 2020/21 | FY 2021/22 | FY 2022/23 | FY 2023/24 | FY 2024/25 |
|---|---|---|---|---|---|---|---|
| Payroll and staff | 4 | 5 | 8 | 5 | 3 | 12 | |
| Projects and contracts | 9 | 7 | 7 | 8 | 5 | ||
| Spending not fully supported | 2 | 4 | 8 | 1 | 5 | 2 | |
| Assets | 1 | 2 | 2 | 3 | 3 | 3 | 3 |
| Financial statements | 1 | 1 | 5 | 3 | 2 | ||
| Procurement | 3 | 5 | 1 | 3 | |||
| Budget control | 1 | 2 | 1 | 1 | 1 | 1 | 2 |
| Pending bills | 1 | 1 | 3 | 3 | 1 | 2 | |
| Transfers and funds | 1 | 2 | 2 | 1 | 2 | 1 | |
| Governance | 1 | 1 | 1 | 2 | 2 | ||
| Imprest | 1 | 1 | 2 | 1 | 1 | 1 | |
| Cash and bank | 2 | 2 | 1 | 1 | 1 | ||
| Revenue | 1 | 1 | 2 | ||||
| ICT systems | 1 | 1 | 1 | ||||
| Other | 1 | 2 | 2 | 3 | 3 | 3 |
County Assembly
| Category | FY 2020/21 | FY 2022/23 | FY 2023/24 | FY 2024/25 |
|---|---|---|---|---|
| Payroll and staff | 2 | 4 | 4 | 4 |
| Projects and contracts | 1 | 1 | ||
| Spending not fully supported | 1 | 2 | ||
| Assets | 1 | 3 | ||
| Financial statements | 2 | 1 | 1 | 2 |
| Procurement | 2 | 1 | ||
| Budget control | 1 | 1 | 1 | 1 |
| Pending bills | 1 | |||
| Transfers and funds | 1 | 1 | ||
| Governance | 1 | 2 | ||
| Imprest | 1 | |||
| ICT systems | 1 | 1 | ||
| Other | 1 | 1 |
Matters carried forward as unresolved
Only what the reports themselves say is shown here. A matter is linked to an earlier year when the report says it dates from that year, when the next report lists it as unresolved, or when the same named contract or requirement appears again.
County Executive: listed as unresolved in the following year’s report
FY 2023/24: 31 matters listed as unresolved in the FY 2024/25 report
- 19 staff each paid over KSh 2m in travel allowances (FY 2023/24 report, PDF p. 46, paragraph 2.1.1)
- Transport companies hired without clear selection (FY 2023/24 report, PDF p. 46, paragraph 2.1.2)
- Travel allowance paid to the county government account (FY 2023/24 report, PDF p. 46, paragraph 2.1.3)
- Executive paid Assembly members' sitting allowances (FY 2023/24 report, PDF p. 46, paragraph 2.1.4)
- Training without needs assessments (FY 2023/24 report, PDF p. 47, paragraph 2.2)
- Legal fees and an out-of-court settlement not supported (FY 2023/24 report, PDF p. 47, paragraph 2.3)
- Transfers differ from IFMIS records (FY 2023/24 report, PDF p. 48, paragraph 3.1)
- Bank reconciliations include July 2024 receipts (FY 2023/24 report, PDF p. 48, paragraph 4.0)
- Land parcels bought without supporting documents (FY 2023/24 report, PDF p. 49, paragraph 5.0)
- Exchequer receipts of 2 to 5 July 2024 counted in the year (FY 2023/24 report, PDF p. 49, paragraph 6.0)
- 1,500 IFMIS transactions voided without explanation (FY 2023/24 report, PDF p. 49, paragraph 7.0)
- Underfunding of 18% of the budget (FY 2023/24 report, PDF p. 50, paragraph 1)
- Pending bills unsettled beyond 60 days (FY 2023/24 report, PDF p. 50, paragraph 2)
- Rent for official residences; residences not built (FY 2023/24 report, PDF p. 51, paragraph 1)
- Staff medical insurance premium paid at 52% (FY 2023/24 report, PDF p. 51, paragraph 2)
- 245 employees with net pay below one-third of basic pay (FY 2023/24 report, PDF p. 52, paragraph 3)
- 89% of permanent staff from one community (FY 2023/24 report, PDF p. 52, paragraph 4)
- Imprests not surrendered; nine staff given second imprests (FY 2023/24 report, PDF p. 52, paragraph 5)
- 22 of 23 oversight committee recommendations not implemented (FY 2023/24 report, PDF p. 52, paragraph 6)
- County buildings not insured (FY 2023/24 report, PDF p. 53, paragraph 7)
- Payments to the Council of Governors and the Lake Region Economic Bloc (FY 2023/24 report, PDF p. 53, paragraph 8)
- Stadium power connection paid but not installed (FY 2023/24 report, PDF p. 53, paragraph 9.1)
- Stadium seats: advance paid without inspection; fewer seats installed (FY 2023/24 report, PDF p. 54, paragraph 9.2)
- Migwena perimeter wall delayed (FY 2023/24 report, PDF p. 54, paragraph 9.3)
- Migwena washroom and electrification works delayed (FY 2023/24 report, PDF p. 55, paragraph 9.4)
- Siaya County Stadium: 24% cost increase and nine extensions (FY 2023/24 report, PDF p. 55, paragraph 9.5)
- Aggregation and industrial park works behind schedule (FY 2023/24 report, PDF p. 55, paragraph 9.6)
- Yala cattle ring incomplete (FY 2023/24 report, PDF p. 56, paragraph 9.7)
- Akala health centre toilets and bathrooms incomplete (FY 2023/24 report, PDF p. 56, paragraph 9.8)
- X-ray machine at Got Agulu Hospital idle for lack of a radiographer (FY 2023/24 report, PDF p. 57, paragraph 9.9)
- No risk assessment report (FY 2023/24 report, PDF p. 57, paragraph 1)
County Assembly: listed as unresolved in the following year’s report
FY 2023/24: 13 matters listed as unresolved in the FY 2024/25 report
- Ward office operations charged to compensation of employees (FY 2023/24 report, PDF p. 54, paragraph 1)
- Legal services without procurement records (FY 2023/24 report, PDF p. 54, paragraph 2)
- Underfunding of 12% of the budget (FY 2023/24 report, PDF p. 55, paragraph 1)
- Fuel framework contract with four suppliers instead of seven (FY 2023/24 report, PDF p. 56, paragraph 1.1)
- Ward meeting halls, boreholes and water kiosks stalled (FY 2023/24 report, PDF p. 56, paragraph 1.2)
- 94% of staff from one community (FY 2023/24 report, PDF p. 57, paragraph 2.1)
- Officers with net pay below one-third of basic pay (FY 2023/24 report, PDF p. 57, paragraph 2.2)
- Officer acting for more than six months (FY 2023/24 report, PDF p. 57, paragraph 2.3)
- Pending bills outstanding beyond 60 days (FY 2023/24 report, PDF p. 57, paragraph 3.0)
- County Assembly Fund not established (FY 2023/24 report, PDF p. 57, paragraph 4.0)
- Late remittance of statutory deductions (FY 2023/24 report, PDF p. 58, paragraph 5.0)
- ICT steering committee met twice; projects without its recommendation (FY 2023/24 report, PDF p. 58, paragraph 6.0)
- Internal audit issued one report in the year (FY 2023/24 report, PDF p. 59, paragraph 1)
Matters the report says date from an earlier year
- County Executive, FY 2019/20: Imprests issued in 2018/19 not surrendered. The report says: Imprests issued in FY 2018/19 were still not surrendered at 30 June 2020. (report, PDF p. 528)
- County Executive, FY 2020/21: Pending bills carried forward, some outstanding since 2014. The report says: Report states some bills have been outstanding since 2014. (report, PDF p. 37)
- County Executive, FY 2021/22: Prior-year matters unresolved. The report says: Report states issues from the previous year remain unresolved. (report, PDF p. 49)
- County Executive, FY 2021/22: Imprests surrendered late or outstanding over a year. The report says: Report states some imprests were outstanding for more than a year. (report, PDF p. 50)
- County Executive, FY 2021/22: 23 disciplinary cases not determined, some since 2014. The report says: Report states some cases date back to 2014. (report, PDF p. 56)
- County Executive, FY 2022/23: Retention and deposits block figure unsupported. The report says: Report states the same balance appeared in the prior year. (report, PDF p. 44)
- County Executive, FY 2022/23: Prior-year matters unresolved. The report says: Report states issues from the previous year remain unresolved. (report, PDF p. 45)
- County Executive, FY 2022/23: Tax arrears to KRA outstanding over two years. The report says: Report states the obligation had been outstanding for over two years. (report, PDF p. 49)
- County Executive, FY 2023/24: Prior-year matters unresolved. The report says: Report states issues from the previous year remain unresolved. (report, PDF p. 50)
- County Executive, FY 2023/24: Imprests not surrendered; nine staff given second imprests. The report says: Report states KSh 520,050 relates to FY 2022/23. (report, PDF p. 52)
- County Executive, FY 2023/24: 22 of 23 oversight committee recommendations not implemented. The report says: Recommendations were on the FY 2021/22 audit report. (report, PDF p. 52)
- County Executive, FY 2024/25: Payables brought forward, some ten years old. The report says: Report states some payables date back ten years. (report, PDF p. 50)
- County Executive, FY 2024/25: 30 prior-year matters unresolved (Appendix 1). The report says: Report lists 30 FY 2023/24 matters as unresolved (PDF p. 63-65). (report, PDF p. 51)
- County Assembly, FY 2020/21: Penalties for late tax remittance; pension fund interest claim. The report says: Report states the pension interest accrued over several years. (report, PDF p. 31)
- County Assembly, FY 2023/24: Prior-year matters unresolved. The report says: Report states issues from the previous year remain unresolved. (report, PDF p. 55)
- County Assembly, FY 2024/25: 13 prior-year matters unresolved. The report says: Report lists 13 FY 2023/24 matters as unresolved (PDF p. 56). (report, PDF p. 55)
The same contract or requirement reported in more than one year
- Siaya County Stadium incomplete 23 months after completion date (County Executive): reported in FY 2020/21, FY 2021/22, FY 2022/23, FY 2023/24. Same contract (signed 30 August 2018, KSh 394,661,767) reported again.
- Siaya Bus Park incomplete; extension not evaluated (County Executive): reported in FY 2021/22, FY 2022/23. Same contract (KSh 23,014,867) reported again.
- ERP system still in development 14 months after contract (County Executive): reported in FY 2021/22, FY 2022/23. Same ERP contract (KSh 72,420,000) reported again.
- Five ECD classrooms incomplete, including Kirindo Primary (County Executive): reported in FY 2021/22, FY 2022/23. Same ECD classroom at Kirindo Primary School reported again.
- Aggregation and industrial park works behind schedule (County Executive): reported in FY 2023/24, FY 2024/25. Same aggregation and industrial park contract (about KSh 483.69m) reported again.
- County Assembly Fund not established (County Assembly): reported in FY 2022/23, FY 2023/24. Same requirement (County Assembly Fund, County Assembly Act 2017 s.34) reported again.
- Ward office operations charged to compensation of employees (County Assembly): reported in FY 2022/23, FY 2023/24, FY 2024/25. Same misposting (ward and general office operations charged to compensation of employees) reported again.
Caveats
- FY 2024/25 reports use transitional accrual IPSAS; earlier years are cash basis.
- OCR (FY 2024/25) and the FY 2019/20 committee report are graded 3; text-layer audit reports are graded 4.
- The FY 2014/15 and 2015/16 opinions are reused from data/history.json and come from a Senate compilation.
- Category counts depend on how the auditor split paragraphs, so a rise in count is not by itself a worsening.
Sources: 12 documents from the Parliament library, each linked beside its opinion and findings. Every finding is in the dataset catalogue and in siaya-audits.json. See also the fiscal reconciliation and the Siaya County hub.
Why own-source revenue totals differ: OSR, FIF and A-i-A explained.